/
MCK Services, Inc., A Joint Venture
An Equal Opportunity Employer
Is requesting quotations from all qualified UDBE subcontractors and material suppliers for the following project:
Agency: Caltrans
Project #: 04-4470U4 (04-CC-680-0.0/R12.8)
Project Name: Construction on State Highway 680
Project Description: Construction on State Highway 680 in Contra Costa County, rehabilitate roadway with concrete and hot mix asphalt.
Engineer's Estimate: $61,000,000.00
500 WD and $10,500.00 per day LD
UDBE Goal: 4%
Submit quotes by 12:00pm on June 30, 2010
Bid Date: August 4th, 2010 at 2:00 PM
This request includes, but is not limited to, the following:
Temp Fence, Construction Site Management, Prepare Storm Water Prevention Pollution Prevention Plan, Temp Drainage Inlet Protection, Street Sweeping, Temp Concrete Washout, Construction Area Signs, Traffic Control System, Temp Pavement Marking, Temp Traffic Stripe, Channelizer, Temp Pavement Marker, Portable Changeable Message Sign, Temp Railing, Movable Concrete Barrier, Temp Crash Cushion, Noise & Vibration Monitoring, Remove Metal Beam Guardrail, Remove Thermoplastic Markings, Remove & Reset Roadside Sign, Remove Sign Structure, Adjust Inlet, Adjust Frame And Cover To Grade, Adjust Facility Cover, Cold Plane Asphalt Concrete Pavement, Remove Concrete, Remove Concrete Barrier, Clean Bridge Deck, Bridge Removal, Clearing & Grubbing, Develop Water Supply, Lead Compliance Plan, Roadside Clearing, Fiber Rolls, Compost Incorporate, Erosion Contril (Hydroseed), Lean Concrete Base, Data Core, Place Hot Mix Asphalt Dike, Tack Coat, Precast Concrete Pavement, Jointed Plain Concrete Pavement, Precast Post –Tensioned Concrete Pavement, Seal Pavement Joint, Seal Isolation Joint, Structural Concrete (Bridge, Retaining Wall), Joint Seal, Bar Reinforcing Steel, Treat Bridge Deck, Furnish Bridge Deck Material, Furnish Single Sheet Aluminum Sign, Install Roadside Sign Panel, Minor Concrete, Misc. Iron & Steel, Concrete Barrier Marker, Delineator, Metal Beam Guardrail, Tubular Handrailing, Transition Railing, Anchor Assembly, Alternative In-Line Terminal System, Concrete Barrier, Thermoplastic Pavement Striping, Pavement Markers, Maintain Existing Traffic Management System Elements During Construction, Lighting & Sign Illumination, Loop Detector Replacement, High Speed Weigh-In-Motion System, Traffic Operations System, Electrical And Trucking.
Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be obtained through the Department of Transportation via their website at: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Mr. Thomas Smith is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.
(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractor will be required to sign a job agreement for trades covered under our agreements.)
Ghilotti Construction Company, Inc. / MCK Services, Inc., A Joint Venture
246 Ghilotti Ave
Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601
Contact: Kameron Rankin
kameron@ghilotti.com
|