Ghilotti Construction

License# 644515

An Equal Opportunity Employer

Is requesting quotations from all qualified MBE/WBE subcontractors and material suppliers for the following project:

Agency: San Francisco Bay Area Rapid Transit (BART)

Contract No.: 15PP-110

Project Name: Earthquake Safety Program Station Structures – C Line

Project Description: Ghilotti Construction Company, Inc. is seeking certified MBE/WBE subcontractors and suppliers for work in Alameda County for BART. The Work, in general, includes furnishing all labor, equipment, tools, materials, management, coordination, professional services and other services required to construct structural modifications to C Line Stations (Orinda Station, Walnut Creek Station and Pleasant Hill Station) as specified in the Contract Drawings and Contract Specifications). The Work consists predominantly of seismic retrofit including but not limited to: concrete overlay and widening of existing pile caps, concrete infill walls, installation of micropiles, thickening of existing bent caps, reinforcing of existing platform canopy and construction of related electrical, mechanical, architectural and sitework. The Contractor shall also provide asbestos and lead paint abatement in accordance with the Contract Documents. Some of the work must be performed at night when the stations are closed.

Engineer's Estimate:  $12 - 16 million

MBE Goal: 23% / WBE Goal: 12%

1020 CD / $3,600.00 per day LD

Submit quotes by NOON on bid date.

 

Location: Various Cities, Alameda County, CA

 

Bid Date: January 4th, 2011 at 2:00 PM

This request includes, but is not limited to, the following:

TRAFFIC MAINTENANCE AND CONTROL, DEMOLITION, SELECTIVE STRUCTURE DEMOLITION, ASBESTOS ABATEMENT, CONCRETE REINFORCING, FRP COLUMN CASINGS, CANOPY MODIFICATIONS, PLATFORM GIRDER TIE ASSEMBLY, EXPANSION CONTROL DEVICES, ARCHITECHTURAL WORK, DEMOLISH & RECONSTRUCT RESTROOMS, STAIR & ESCALATOR MODIFICATIONS, SAFETY NETTING, FIRE SUPPRESSION SYSTEM, PLUMBING WORK, ELECTRICAL WORK, MICROPILES, SIGNAGE, CHAIN LINK FENCES AND GATES AND TRUCKING

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also viewed / purchased SF BART at 300 Lakeside Drive, 23rd Floor, Oakland, CA or by calling 510/464-7546, local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location as well as in trade publications such as Daily Pacific Builder or Daily Construction Services. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Mr. Nick Keane (415/256-1525 or  nickk@ghilotti.com), is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans and specifications, bid preparation and obtaining bonds, lines of credit and insurance.

Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.

(Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108.  G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR.  Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) 

Ghilotti Construction Company, Inc.

246 Ghilotti Ave

Santa Rosa, CA 95407
Phone: (707) 585-1221 Fax: (707) 585-1601

Contact: Annette Conley

annette@ghilotti.com

Published on December 13th, 2010 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME