Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: September 26th, 2017 through bid opening date

 

Project No. 17014.

Project Name/Description: FOR CONSTRUCTION OF LEFT TURN CHANNELIZATION ON SOUTH UNION AVENUE FROM TAFT HIGHWAY TO MING AVENUE

DBE GOAL: 6%

Project Location: Kern County

BID DATE: October 11, 2017

This request includes the following but not limited to:
LEAD COMPLIANCE PLAN, TEMPORARY TRAFFIC CONTROL,  STORM WATER POLLUTION PREVENTION PLAN, REMOVE AND SALVAGE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN ONE POST, REMOVE CONCRETE (F),
DEVELOP WATER SUPPLY, ROADWAY EXCAVATION (F), FINISH ROADWAY, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), ROADSIDE SIGN – ONE POST, MINOR CONCRETE (CURB), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), SURVEY MONUMENT ENCASEMENT, THERMOPLASTIC PAVEMENT MARKING, PAINT TRAFFIC STRIPE (2-COAT), PAINT MEDIAN NOSE,PAVEMENT MARKER (RETROREFLECTIVE), MOBILIZATION

 

 

Published on September 26th, 2017 by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME