Advertisement date December 18th, 2018 @ 5:08 pm through bid opening date

ES CON

AMES CONSTRUCTION, INC. American Flag
391 N. Main St., Ste 302
Corona, CA 92880
(951) 356-1275 (951) 549-9003 FAX

Ames Construction, Inc. is seeking certified and qualified DBE subcontractors to meet the 18% DBE goal for the following:

 PROJECT:12-0K0224 - Construct bridges and improvements in Mission Viejo and Laguna Hills, South of Oso Parkway

OWNER: California Department of Transportation (CALTRANS)

BID DATE: January 16th, 2019 @ 2:00 PM

PLEASE SUBMIT BID TO: Ames Construction, Inc.
391 N. Main St., Suite 302
Corona, CA 92880
Phone: (951) 356-1275
Fax: (951) 549-9003

DBE Subs/Suppliers required include but are not limited to: DBE Subs/Suppliers required include but are not limited to: Trucking, Lead compliance, construction area signs, roadway signs, traffic control, pavement marking & striping, objects and markers, K-Rail, PCMS, SWPPP, QA/QC, erosion control, street sweeping, asbestos compliance plan, treated wood base, noise/vibration monitoring, surveying, demo, excavation/back-fill, clearing, dust palliative, imported borrow, rock blanket, landscaping and irrigation, hydroseed, Pipe - PVC/GSP/RCP/APC/DIP/CHDPP conduit, valves, pipe supply, aggregates-base & sub-base, lean concrete base, sand, concrete supply, HMA , dike, cold-plane, grinding, jointed plain concrete pvmnt, ground anchor, soil nail, concrete block slough wall, MSE, jacking superstructure, F&D steel Pile, F&D CIS Shell conc Piling, CIDH concrete pile, structural concrete, minor concrete, architectural treatment, fractured rib texture, drill &bond dowell, F&E PC/PS Concrete girder, PS CIP Concrete, rebar, steel casing, joint seal, shotcrete, concrete flared end section, PC manhole, RSP, concrete ditch lining, sign structure, bridge removal, DWS, booster pump, drainage, welding, railing, misc iron & steel, fencing, cable railing, concrete barrier, CCTV and electrical. Ames intends to conduct itself in good faith with DBE firms for participation on this project. Ames will work with subcontractors to breakdown items into economical feasible packages.

Ames intends to conduct itself in good faith with DBE firms for participation on this project. Ames will work with subcontractors to breakdown items into economical feasible packages.

Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values. Costs of the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction, Inc. can assist you in your bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project. We are an equal opportunity employer. Ames’ Subcontract terms and conditions will apply to any contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the “Terms and Conditions” including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all quotations.

Bidders pricing to be held through award of contract.

Our contact for this project is Tony Mendez. He can be reached at (951) 356-1275. Please fax quotes to (951) 549-9003

 Plans and specifications can be viewed and downloaded at: 
https://ames.sharefile.com/d-s8985bef9ab644abb

 

Published on December 18th, 2018 @ 5:08 pm by Contractor’s Estimate, Inc.