
An Equal Opportunity Employer
Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified D/M/W/S/DV/LGBTBE/Section 3 ,Subcontractors/Suppliers for:
Agency: San Luis Obispo Nonprofit Housing Corporation
Project: Monterey Family Apartments
Project Location: 1422 Monterey Street, San Luis Obispo, California
Plans and Specs are available here:
025-080 Monterey Family Apartments, SLO NP Housing Corp (HASLO)
D/M/W/S/DV/LGBTBE/Section 3 participation
Bids Due: 5 p.m. Wednesday, December 31st, 2025
**Addendums 1-4 issued**
General work description: Construction of the Monterey Family Apartments, containing one 5 story mixed-use building made up of 45 low-income affordable units, a manager’s unit, commercial shell, community space, one duplex building made up of one 1-bed unit and one 3-bed unit, one triplex building made up of two 1-bed units and one 3-bed unit, one 3-story parking garage and associated onsite and offsite improvements
Quotes for Services and Supplies requested for the following items for bid including, but not limited to:
Demolition (Site Demo, Tree Removal, And Asbestos), Traffic Control, Temp Erosion Control, Surveying, Earthwork And Grading/Mobilization, Utilities (Storm Drain, Sewer, Gas, Water, Dry), Asphalt Paving/Striping And Signage, Site Furnishings, Fencing (Wood Fence, Metal Fence), Landscape, Concrete, Unit Masonry, Structural Steel, Miscellaneous Steel, Rough Carpentry, Finish Carpentry, Cabinets, Countertops, Waterproofing, Insulation, Roofing/Curb And Hatches/Metal Siding, Deck Coatings, Flashing And Sheet Metal, Downspouts/Gutters, Doors And Frames, Storefront Systems/Windows/Glazing, Lath And Plaster, Drywall, Tile, Flooring, Painting, Exterior And Interior Signage, Prefab Awnings, Mailboxes, Toilet Accessories, Appliances, Elevators, Fire Protection/Fire Sprinklers, Plumbing, HVAC, Electrical, Fire Alarms/Detection
Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested D/M/W/S/DV/LGBTBE/Section 3 firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents.
Specialty Construction, Inc.
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722
Contacts:
Nate Agin / Sheri Shamblin nagin@specialtyconstruction.com / SShamblin@specialtyconstruction.com |