Advertisement date November 30, 2021 @ 12:30 p.m. through bid opening date

License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665

ALL POTENTIAL DBE SUBCONTRACTORS
*********************************************************************************
    THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE subcontractors, suppliers & truckers for the following project: 

Caltrans Contract No. 03-0J7004
In Butte County Near Forest Ranch From 1.3 Miles South To 1.1 Miles South Of Carpenter Ridge Road
District-County-Route-Post Mile: 03-But-32-30.8/31.0

General work description: Construct retaining wall, culvert and place HMA.
Plans & Specs: https://tpcorp.box.com/s/nscu35ich2uujzuo9bj034bruazx1ujv
DBE Goal: 10%

Bid Date: 12/14/2021 @ 2PM    Estimate:  $13,600,000
        
Seeking ALL subcontractors/suppliers/truckers for this project, especially DBE subcontractors, suppliers & truckers, TRADES NEEDED (but not limited to):Lead Compliance Plan, Progress Schedule (Critical Path Method), Renewable Diesel Report, Time-Related Overhead (Ls), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Plastic Traffic Drums, Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Alternative Temporary Crash Cushion, Automated Flagger Assistance Device, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Erosion Control Blanket, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Reinforced Silt Fence, Temporary Reinforced Silt Fence (Type 1), Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Contractor-Supplied Biologist (Ls), Clearing And Grubbing (Ls), Roadway Excavation, Shoulder Backing, (F) - Structure Excavation (Soldier Pile Wall), (F) - Concrete Backfill, (F) - Lean Concrete Backfill, Bonded Fiber Matrix (Sqft), Rolled Erosion Control Product (Netting), Fiber Rolls, Compost (Cy), Incorporate Materials, Permanent Erosion Control Establishment Work, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Minor Hot Mix Asphalt, Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Ground Anchor (Subhorizontal), Steel Soldier Pile (Hp 14 X 73), Steel Soldier Pile (Hp 14 X 132), 30" Drilled Hole, (F) - Structural Concrete, Waler, (F) - Structural Concrete, Barrier Slab, (F) - Bar Reinforcing Steel (Epoxy Coated) (Waler), (F) - Timber Lagging, Clean And Paint Steel Soldier Piling, 12" Corrugated Steel Pipe, 12" Perforated Steel Pipe Underdrain, Furnish And Install Drain Pipe (Horizontal Drain), Drill Hole (Horizontal Drain), (F) - Class 2 Permeable Material (Blanket), 18" Corrugated Steel Pipe Downdrain (.109" Thick), Tapered Inlet, 18" Downdrain Slip Joint, 18" Anchor Assembly, 24" Steel Flared End Section, Remove Underdrain, Abandon Downdrain, Remove Flume Drains, Remove Flared End Section (Ea), Repair 24" Cmp Culvert, 24" Cured-In-Place Pipeliner, Rock Slope Protection (300 Lb, Class Iv, Method B) (Cy), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Guard Railing Delineator, Milepost Marker, Underdrain Marker, Marker (Culvert), Snow Pole Marker, Remove Marker, Remove Roadside Sign, Salvage Marker (Snow Pole), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign - One Post, Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Transition Railing (Type Wb-31), Alternative In-Line Terminal System, Alternative Crash Cushion, (F) - Concrete Barrier (Type 842), Remove Guardrail, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Painted Traffic Stripe (Water Blasting), Remove Painted Pavement Marking (Water Blasting), Remove Thermoplastic Traffic Stripe (Water Blasting), Portable Temporary Signal Systems.

Please submit bids to us by noon on bid day.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. 

Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through  Friday  from 7:30 AM to 4:00 PM. 

Thompson Builders Corporation is an Equal Opportunity Employer
 Contact:  Shannon Miller
PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Published on November 30, 2021 @ 12:30 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 