www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date November 28, 2022 @ 4:40 p.m. through bid opening date

License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665

An Equal Opportunity Employer
*********************************************************************************
     THOMPSON BUILDERS CORPORATION Is requesting quotations from all qualified DVBE Sub-contractors and Material suppliers performing commercially useful functions for the following project:

Agency: Caltrans No. 04-2J7604
Construction on State Highway In Alameda County In Oakland At East Creek Slough Bridge
DVBE Goal: 3%
Estimate: $3,010,000
General work description: Polyurethane grout injection, plastic lumber and miscellaneous metal

Bids open Thursday, December 22, 2022 at 2:00 PM
***NEW Bid Date Thursday, January 12, 2023 at 2:00 PM***

***Addendums 1-2 Have Been Issued***

Plans & Specs: https://tpcorp.box.com/s/uu1pdr93ztjllqp0xtxkvuvt01k4uqco

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:  Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Ls), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Portable Radar Speed Feedback Sign System Day, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Water Pollution Control Program, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Fiber Roll, Temporary Reinforced Silt Fence, Temporary Construction Entrance, Temporary Construction Roadway, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Treated Wood Waste, Temporary Construction Mat (Ls), Clearing And Grubbing (Ls), (F) - Structure Excavation (Type D), Polyurethane Grout Injection, Roadside Clearing, Soil Amendment, Packet Fertilizer, Plant (Group B), Plant Establishment Work, Wood Mulch, 1 1/2" Wye Strainer Assembly, Riser Sprinkler Assembly, Cam Coupler Assembly, (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Schedule 40) (Supply Line), Ball Valve, Move-In/Move-Out (Erosion Control), Hydromulch, Fiber Rolls, Hydroseed, Compost (Cy), Hot Mix Asphalt-Open Graded (Open Graded Friction Course), Tack Coat, Cold Plane Asphalt Concrete Pavement, Drill And Bond Dowel (Chemical Adhesive) (Lf), (F) - Plastic Lumber, Public Safety Plan, Composite Column Casing, Rock Slope Protection (20 Lb, Class I, Method B) (Cy), (F) - Miscellaneous Metal (Bridge), 4' Chain Link Gate (Type Cl-6), Remove Wood Fence, Remove Chain Link Fence, Reconstruct Fence, Guard Railing Delineator, Pavement Marker (Retroreflective), Object Marker (Type P), Midwest Guardrail System (Wood Post), Vegetation Control (Minor Concrete), Transition Railing (Type Wb-31), End Anchor Assembly (Type Ca), Alternative In-Line Terminal System, Remove Guardrail, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), Remove Thermoplastic Traffic Stripe, Mobilization.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding

Thompson Builders Corporation is an Equal Opportunity Employer
 Contact: Leah Oba
PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Published on November 28, 2022 @ 4:40 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 