Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date November 30th, 2017 @ 5:07 p.m. through bid opening date

USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 13%  goal for the
07-291704 CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY IN LONG BEACH AT ROUTE 91/710 SEPARATION Project. 

Bid Date and Time:

DECEMBER 21, 2017 at 2:00 PM

Engineer’s Estimate:

$1.47 MILLION

Estimator’s Name:

JIM LARREA

Email Address:

bidding@usscalbuilders.com

Estimator's Phone:

(714) 828-4882 Ext. 3

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

http://www.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=07-291704

 

The Work includes, but is not limited to: The Work includes, but is not limited to: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, ROADWAY EXCAVATION, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE F), REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, BARRIER SLAB, JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), BRIDGE REMOVAL (PORTION), CARBON FIBER REINFORCED POLYMER STRIP, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN (METAL POST), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), METAL (BARRIER MOUNTED SIGN), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), CONCRETE BARRIER (TYPE 736), CONCRETE BARRIER (TYPE 736 MODIFIED), CONCRETE BARRIER (TYPE 736B), CONCRETE BARRIER (TYPE 736B (MOD)), CONCRETE BARRIER (TYPE 742), CONCRETE BARRIER (TYPE 742 MODIFIED), REMOVE GUARDRAIL, SALVAGE METAL BRIDGE RAILING, SALVAGE CONCRETE BARRIER (TYPE K), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, FLASHING BEACON SYSTEM, TEMPORARY LIGHTING SYSTEM, MODIFYING EXISTING ELECTRICAL SYSTEM, REMOVING EXISTING ELECTRICAL SYSTEM.

If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this
project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

Contractors and Subcontractors must register with D.I.R (Department of Industrial Relations) to bid on public works projects. To verify your status or to obtain a D.I.R number, please visit:
http;//dir.ca.gov/Public-Works/Contractors.html

An Equal Opportunity Employer.

Bidding Department
USS Cal Builders Inc.
8051 Main Street,
Stanton, CA 90680

License # 654454

www.usscalbuilders.com

 

Published on November 30th, 2017 @ 5:07 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME