
Armstrong Cal Builders Inc. An Equal Opportunity Employer is seeking qualified DVBE subcontractors, suppliers for the following project.
Bid Date and Time: |
November 30, 2026 @ 10:00 AM PST |
Project Owner: |
Pasadena Area Community College District (Pasadena City College) |
Project: |
MPCC W-Building Demolition - Bid No. 26011R |
Location: |
Pasadena, CA |
Contact: |
Bidding Dept. |
Email Address: |
bidding@armstrongcalbuilders.com |
Estimator's Phone: |
(657) 332-2300 |
Participation |
3% DVBE Participation |
Plans and Specs Link: |
Sub Folder |
Please see the NIB or Specification section for the subcontractor’s prequalification requirements.
The project includes furnishing all labor, supervision, materials, equipment, tools, transportation, permits, temporary facilities, safety measures, utility coordination, demolition, debris removal, site restoration, and closeout required to complete the MPCC W-Building Demolition Project in accordance with the Contract Documents.
Work includes furniture and equipment removal; interior soft demolition; complete demolition and removal of the existing W-Building, including structural components, roofing, exterior and interior building elements, slabs, foundations, footings, stairs, ramps, and associated improvements; engineered demolition and structural separation of the connecting bridge between the W-Building and R-Building; temporary shoring, bracing, lifting, rigging, and protection of the existing R-Building; installation of required railing and temporary weather-resistant protection at the bridge connection; remaining utility capping, disconnections, and related demolition work assigned to this Contract; unforeseen hazardous materials abatement as required; excavation, backfill, compaction, drainage, temporary site restoration, and repair of affected improvements.
Additional work includes installation and maintenance of temporary construction fencing, barricades, signage, and site security; protection of existing utilities, utility tunnels, sidewalks, roadways, landscaping, and adjacent campus facilities; dust, noise, vibration, stormwater, and environmental controls; traffic control and flagging; demolition debris loading, hauling, recycling, and legal disposal; required testing, inspections, documentation, and project closeout.
Quotes for Services and Supplies requested for the following items for bid including, but not limited to:
Building Demolition, Structural Demolition, Selective Demolition, Interior Soft Demolition, Bridge Demolition, Concrete Demolition, Concrete Cutting & Sawing, Foundation Removal, Slab Removal, Footing Removal, Hazardous Materials Abatement (Unforeseen Conditions), Furniture & Equipment Removal, Utility Capping & Disconnections, Utility Demolition, Electrical Disconnections, Excavation, Earthwork, Grading, Engineered Shoring, Temporary Bracing, Trench & Excavation Protection, Structural Separation, Crane Services, Rigging & Lifting, Temporary Construction Fencing, Gates & Barricades, Site Security, Dust Control, Noise & Vibration Control, Stormwater & Erosion Control, Environmental Controls, Traffic Control, Flagging, Trucking & Hauling, Demolition Debris Removal, Construction Waste Recycling, Waste Disposal, Concrete & Asphalt Restoration, Backfill, Compaction, Aggregate & Base Materials, Site Restoration, Drainage Improvements, Metal Railings, Temporary Weather Protection, Wall-Top Cover Materials (Add Alternate No. 1), Surveying, Testing & Inspections, Equipment Rental, Safety Supplies, Demolition Equipment, and related materials and services. See Specs for Complete list of bid items.
Armstrong Cal Builders Inc. requires 100% Performance & Payment Bonds. If requested, and as Armstrong Cal Builders Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Armstrong Cal Builders Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Armstrong Cal Builders Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications, and addenda regardless of any qualifying language in the proposal. Armstrong Cal Builders Inc. listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.
Each listed subcontractor must execute Armstrong Cal Builders Inc. standard subcontract agreement if Armstrong Cal Builders Inc. is awarded the project; the standard subcontract is available for review at Armstrong Cal Builders Inc. office. At the discretion of Armstrong Cal Builders Inc. any listed subcontractor that withdraws its bid after Armstrong Cal Builders Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work.
This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.
Armstrong Cal Builders Inc.
Office Number: 657-332-2300
License No.: B 990992
An Equal Opportunity Employer |