An Equal Opportunity Employer
Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified DBE,Subcontractors/Suppliers for:
Agency: City of Wasco | Project 2025-03
Project: Well No. 12 - Installation of 1,2,3-TCP Treatment Project
Plans and specs are available at the following link:
25-044 Well No.12 - Installation of 1,2,3-TCP Treatment, Wasco
Bid Date: Bid Date: Thursday, December 18th, 2025 @ 2:00 PM
General work description: The work to be done includes, but is not limited to the following: site grading, subgrade preparation, construction of reinforcconcrete foundations, furnishing and installing GAC vessels and appurtenances, well discharge piping, influent piping, effluent piping, backwash piping, well flush line, appurtenances, drainage piping, blow-down piping, chlorine tank enclosure, nitrate analyzer, nitrate building, electrical and controls, emergency backup diesel generator, appurtenances, and site development, and other items or details not mentioned above, that are required by typical construction
Quotes for Services and Supplies requested for the following items for bid including, but not limited to:
Site Earthwork Including Subgrade Preparation Andnew Sump With Rip-Rap, Gac Vessel Concrete Foundation & Anchor Bolts, Furnish & Install Gac Vessels & Appurtenances, Well Discharge Piping & Appurtenances, Gac Influent Piping & Appurtenances Commencingat The Well Discharge Piping And Ending At Eachgac Vessel Rack Piping, Gac Effluent Piping & Appurtenances Commencingat Each Gac Vessel Rack Piping And Ending At Theconnection To The Well Discharge Piping, Well Flush Line & Hydropneumatic Tank Drainline Including Catch Basins, Splash Pads, And Sumpinlet Structure, 12” Blow-Down Pipeline & Appurtenances, Sump Discharge Pad And Grouted Rip-Rap, 24” Jack & Bore Cased Crossing & Appurtenances, Chlorine Tank Enclosure Concrete Foundation, Chlorine Tank Metal Enclosure & Appurtenances, Hydropneumatic Tank Modifications And Aircompressor With Protective Enclosure, Site Drain Lines And Chemical Lines, Hach Nt3100Sc Nitrate Analyzer Andappurtenances, Nitrate Analyzer Concrete Foundation And Buildingenclosure, Site Ground Cover, Site Painting, Site Electrical And Controls, Start-Up And Testing, Epa Tier 4 Emergency Backup Diesel Generator,Ats, & Appurtenances, Diesel Generator Concrete Foundation & Anchorbolts, Masonry Block Wall And New Gates, Precast Panel Wall And New Gates
Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested DBE, Small, Minority and Women’s Businesses firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents.
Specialty Construction, Inc.
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722
Contacts:
Tom Seidel / Sheri Shamblin tseidel@specialtyconstruction.com / SShamblin@specialtyconstruction.com |