
License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE subcontractors, suppliers & truckers for the following project:
Agency: Sacramento Regional County Sanitation District | Contract No. 6024
Project: Harvest Water Central-South Pipelines
Bids open November 30, 2023, at 11:00 AM
Project description: Construction of approximately 16 miles of a mixture of welded steel and HDPE pipelines in primarily rural Southern Sacramento County roads. Pipe diameters ranging from14-inch to 36-inch. Also includes three trenchless crossings, numerous air valves, blowoffs, buried access manways, isolation valves, and turnout connections.
Plans & Specs: https://tpcorp.box.com/s/161smrh97svqe9k1ovmb5e0ngd00irip
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Quality Control, Land Surveyor, Traffic Control System, Painting And Coatings, Temporary Erosion Control, Clearing & Grubbing, Fencing, Temporary Fencing, Welded Steel Pipe, Plastic Pipe, Aggregate Subbase, Aggregate Base, Asphalt Concrete Paving, Plane Asphalt Concrete, Concrete Cutting, Remove Concrete, Roadway Excavation, Painted Traffic Striping & Marking, Directional Boring/Drilling, Develop Water Supply, Hydroseeding, Manholes, Corrugated Metal Piping
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Small businesses including DVBEs are encouraged to look at Caltrans California Construction Contracting Program Website for possible bonding assistance.
https://buildcalifornia.com/
Thompson Builders Corporation
an Equal Opportunity Employer
Contact: Leah Oba
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com |