www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date: October 22nd, 2019 @ 11:21 a.m. through bid opening date

James McMinn, Inc (JMI) An Equal Opportunity Employer
Is requesting quotations from all qualified DBE
subcontractors and material suppliers firms performing commercially useful function for the following project:

Project: Regrade median cross slopes
Project Owner: Caltrans
Project No. 08-0R1504
Lead Estimator: Ryan Hidy  Phone (909) 514-1231
Bid Date: Wednesday, November 13, 2019 @ 2:00 PM
Please Fax Quotes to: (909) 514-0553
DBE Goal: 17%.

JMI is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to:Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Develop Water Supply, Construction Area Signs, Retroreflective Sheeting (Type Xi) For Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Alternative Temporary Crash Cushion, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Erosion Control Blanket, Temporary Soil Binder, Temporary Cover, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Construction Entrance, Temporary Concrete Washout, Treated Wood Waste, Contractor-Supplied Biologist (Ls), Temporary High- Visibility Fence, Clearing And Grubbing (Ls), Dust Palliative, Roadway Excavation, Shoulder Backing, Imported Borrow (Cy), Plant (Group A), Plant Establishment Work, Wood Mulch, Move-In/Move-Out (Erosion Control), Duff (Acre), Fiber Rolls, Hydroseed, Class 2 Aggregate Base (Cy), Minor Hot Mix Asphalt, Place Hot Mix Asphalt (Miscellaneous Area), Structural Concrete, Box Culvert, Bar Reinforcing Steel, 48" Reinforced Concrete Pipe, 54" Reinforced Concrete Pipe, 60" Reinforced Concrete Pipe, 72" Reinforced Concrete Pipe, 36" Corrugated Steel Pipe (.079" Thick), 42" Corrugated Steel Pipe (.109" Thick), 48" Corrugated Steel Pipe (.109" Thick), 49" X 33" Corrugated Steel Pipe Arch (.109" Thick), 57" X 38" Corrugated Steel Pipe Arch (.109" Thick), 64" X 43" Corrugated Steel Pipe Arch (.109" Thick), 77" X 52" Corrugated Steel Pipe Arch (.109" Thick), Drainage Inlet Marker, 36" Corrugated Steel Pipe Inlet (.079" Thick), 36" Steel Flared End Section, 42" Steel Flared End Section, 48" Steel Flared End Section, 54" Steel Flared End Section, 60" Steel Flared End Section, 72" Steel Flared End Section, 49" X 33" Steel Flared End Pipe Arch Section, 57" X 38" Steel Flared End Pipe Arch Section, 64" X 43" Steel Flared End Pipe Arch Section, 77" X 52" Steel Flared End Pipe Arch Section, Remove Culvert (Lf), Remove Flared End Section (Ea), Rock Slope Protection (1/4 T, Class V, Method B) (Cy), Rock Slope Protection (300 Lb, Class Iv, Method B) (Cy), Rock Slope Protection (1T, Class Viii, Method B), Rock Slope Protection (1/2 T, Class Vii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Miscellaneous Iron And Steel, Fence (Type Bw, 4-Strand, Metal Post), Temporary Desert Tortoise Fence, Delineator (Class 1), Guard Railing Delineator, Marker (Culvert), Object Marker, Midwest Guardrail System (Wood Post), Vegetation Control (Minor Concrete), Cable Railing, Transition Railing (Type Wb-31), End Cap (Type A), End Anchor Assembly (Type Sft), Alternative In-Line Terminal System, Remove Guardrail, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Mobilization.

Plans and specifications are available to view at our office or online at:
http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=08-0R1504

If you have any questions, please contact Ryan Hidy at (909) 514-1231 or email estimating@jmige.com
All quotes should be sent before 1pm on bid day 

Requirements: No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work, unless currently registered to perform public work with the Dept of Industrial Relations https://efiling.dir.ca.gov/PWCR/Search.action

JMI will pay for bond premium up to 1.5%. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# 100% performance and payment bonds may be required for the full amount of subcontract price. JMI is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participitation.

Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting JMI's requirements Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. JMI intends to work cooperatively with all qualified firms seeking work on this project.

*PLEASE PROVIDE DIR # WITH QUOTE*

Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.

 

Published on October 22nd, 2019 @ 11:21 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME