www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 19, 2021 @ 10:50 a.m. through bid opening date


Papich Construction Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Agency: Caltrans Contract No. 06-0U2804
Construction on State Highway In Tulare County Near Woodlake At Yokohl Creek Bridge And At Kaweah River Bridge
General work description: Precast prestressed concrete box girder and slab, bridge removal.
District-County-Route-Post Mile: 06-Tul-245-1.4, 4.2
Plans & Specs: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=06-0U2804
Estimate: $11,500,000
DBE Goal: 24%

Bids open November 18, 2021 at 2:00 PM

Contact: Michele Marquez
Email: mmarquez@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Type Iii Barricade, Portable Changeable Message Sign (Ls), Automated Flagger Assistance Device Day, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Storm Water Annual Report, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Hydroseed, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Work Area Monitoring (Bridge), Treated Wood Waste, Bird Exclusion Device, Clearing And Grubbing (Ls), Roadway Excavation, (F) - Structure Excavation (Bridge), (F) - Structure Excavation (Type D), (F) - Structure Backfill (Bridge), Imported Borrow (Cy), Hydromulch, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Furnish Piling (Class 200) (Alternative W), Drive Pile (Class 200) (Alternative W), Furnish 36" Cast-In-Steel Shell Concrete Piling, Drive 36" Cast-In-Steel Shell Concrete Pile, (F) - Structural Concrete, Bridge Footing, (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Headwall, Furnish Precast Prestressed Concrete Box Girder (40'-50'), Furnish Precast Prestressed Concrete Box Girder (60'-70'), Furnish Precast Prestressed Concrete Slab (Type Siv), Erect Precast Prestressed Concrete Box Girder, Erect Precast Prestressed Concrete Deck Unit, Joint Seal (Mr 1"), (F) - Bar Reinforcing Steel (Bridge), (F) - Headed Bar Reinforcement, Remove Sheet Pile Check Dam, Bridge Removal, Location A, Bridge Removal, Location B, 24" Corrugated Steel Pipe (.079" Thick), 12" Pipe Downdrain, 12" Alternative Flared End Section, Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Delineator (Class 1), Pavement Marker (Retroreflective), Object Marker (Type P), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign - One Post, Midwest Guardrail System (Steel Post), Transition Railing (Type Wb-31), End Anchor Assembly (Type Sft), Alternative In-Line Terminal System, Alternative Crash Cushion System, (F) - California St-75 Bridge Rail (Modified), Remove Guardrail, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), 4" Conduit (Bridge), Mobilization

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE/DVBE/SB firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE/DVBE/SB firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published on October 19, 2021 @ 10:50 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME