www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date: September 23rd, 2019 @ 11:52 a.m. through bid opening date

Argonaut Constructors

License# 171432

A California Company

In Business since 1957

Is requesting quotations from all qualified DBE subcontractors and material suppliers for the following project:

Agency: Caltrans

   Caltrans Project No. 01-362704, Federal Aid No. ACNH-P001 (660) E

Project Name: Construction on State Highway in Mendocino County near Fort Bragg from 0.1 mile North of Pudding Creek Bridge to 0.6 mile North of Wages Creek Bridge.

District-County-Route-Post Mile 01-Men-1-62.2/R78.9

      Project Description: Argonaut Constructors is seeking certified DBE subcontractors and suppliers for this hot mix asphalt overlay project.

Engineers Estimate: $14,700,000.00

DBE Goal: 16%

Time for Completion 75-105 Working Days and Liquidated Damages $10,000.00 per Calendar day

Submit quotes by NOON on bid date.

Contact our Estimator for more information or assistance.

Location: Mendocino County

Bid Date: October 31, 2019 at 2:00 pm

This request includes, but is not limited to, the following:

Construction area signs, lead compliance plan, trucking, water trucks, HMA material supplier, tack oil supplier, traffic control, jobsite management, temporary items (concrete washout, drainage inlet protection, check dam, railing Type K, pedestrian access route, gravel bag berm,  high visibility fence)   6” and 8” thermoplastic striping and markings install and removal, cold plane asphalt, portable changeable message signs, water pollution control plan, pavement markers remove and install,  shoulder backing, crack treatment, remove and install hot mix asphalt dike type A, C, E, and F, channelizers surface mounted, alternative temporary crash cushion, asbestos compliance plan, treated wood waste, progress schedule critical path method,  date core,  midwest guard rail system (special) and midwest guardrail system (8’ post), remove and installation vegetation control mat (fiber), 12” rumble strip (asphalt concrete pavement), modify existing electrical system, minor concrete (minor structure), adjust manholes and valve box frame & cover to grade, transition railing(type wb-31), end anchor assembly (type sft), alternative in-line terminal system, reconstruct guardrail (steel post and wood post)

Plans: Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Copies of the contract documents are available from the Caltrans at http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php or local plan rooms, builder’s exchanges, and Dodge World Wide Network. Argonaut Constructors encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Info: Mr. Christer Berglund (707-542-4862 or christerb@argonautconstructors.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. Argonaut Constructors (Argonaut) may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: Argonaut may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108.  Argonaut may pay bond premiums up to 1 ½% of contract cost. Argonaut Constructors is a UNION CONTRACTOR.  Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.

Requirements: By submitting a proposal, the bidder affirms that they have carefully examined all the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Argonaut is willing to break down items into economically feasible packages and we are willing to break out any portion of work to encourage participitation. Argonaut’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions or exceptions included in the subcontractor’s bid proposal. Argonaut is relying on the price submitted in the subcontractor’s proposal as all-inclusive price for its trade scope found in the plans and specifications regardless of any qualifying language in the proposal. Inconsistent bid terms and conditions shall be void.  Argonaut written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection at our office in Santa Rosa and/or can be provided upon written request prior to bid submission.

Insurance: As per our insurance requirements, your bid must include the cost of naming Argonaut Constructors as additional insured; including completed operations coverage; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required.

**ALL QUALIFIED APPLICANTSWILL RECEIVE CONSIDERATION FOR EMPLOYMENT WITHOUT REGARD TO RACE, COLOR, RELIGION, SEX, OR NATIONAL ORIGIN**

**ARGONAUT CONSTRUCTOTS COMPANY IS AN EQUAL OPPORTUNITY EMPLOYER**

Argonaut Constructors
1236 Central Avenue
Santa Rosa, CA 95401
Phone: (707) 542-4862 Fax: (707) 542-4897
Contact: Dave Stanford
Contract Administrator
daves@argonautconstructors.com

Published on September 23rd, 2019 @ 11:52 a .m by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME