
License# 171432
A California Company
In Business since 1957
An Equal Opportunity Employer.
Request for DBE/WBE/MBE Subcontractor & Supplier Quotes
Project: Arrowhead/Burns Valley & Olympic Drive Rehabilitation
Agency: City of Clearlake
Project No.: LF2025(1)
Location: Clearlake, CA
Engineer’s Estimate: $4,400,000
DBE Goal: 30.1%
Completion Time: 60 Working Days
Liquidated Damages: $1,400
Bid Date: 09.29.25
Submit Quotes by: NOON on Bid Date
Project Scope: We are seeking qualified DBE/WBE/MBE subcontractors and suppliers for work on this highway construction project, which includes:
- 0002 - Traffic Control System
- 0004 - Adjust Water Valve Frame and Cover to Grade
- 0005 - Adjust Sewer Manhole Frame and Cover to Grade
- 0006 - Adjust Sewer Cleanout Frame and Cover to Grade
- 0007 - Adjust Air Release Valve Frame and Cover to Grade
- 0008 - Traffic Signal Loop Detector Infrastructure
- 0009 - Cold Planing - Asphalt Concrete
- 0010 - Paving Fabric
- 0013 - Thermoplastic 12" Limit Line - White
- 0014 - Thermoplastic Dashed Yellow Line - Caltrans Detail 2
- 0015 - Thermoplastic Double Yellow Center Line - Caltrans Detail 22
- 0016 - Thermoplastic Right Edge Line - Caltrans Detail 27b
- 0017 - Thermoplastic Two-Way Left Turn Line - Caltrans Detail 32
- 0018 - White Thermoplastic Markings
- 0019 - Thermoplastic Ladder Crosswalk - Yellow
- 0020 - Thermoplastic Basic Crosswalk - White
- 0002 - Traffic Control System - In Arrowhead/Bv Project
- 0003 - Adjust Water Valve Frame and Cover to Grade
- 0004 - Adjust Sewer Manhole Frame and Cover to Grade
- 0005 - Adjust Storm Drain Inlet Frame and Cover to Grade
- 0006 - Adjust Storm Drain Manhole Frame and Cover to Grade
- 0007 - Traffic Signal Loop Detector Infrastructure
- 0008 - Cold Planing - Asphalt Concrete
- 0010 - Paving Fabric
- 0017 - Class 2 Metal Post with Type E Delineator
- 0018 - Thermoplastic Double Yellow Line - Caltrans Detail 22
- 0019 - Thermoplastic Right Edge Line - Caltrans Detail 27b
- 0020 - Thermoplastic Two Way Left Turn Line - Caltrans Detail 32
- 0021 - Thermoplastic Channelizing Line - Caltrans Detail 38
- 0022 - Thermoplastic Channelizing Line - Caltrans Detail 38a
- 0023 - Thermoplastic Bike Lane - Caltrans Detail 39
- 0024 - Thermoplastic Bike Lane Dashed - Caltrans Detail 39a
- 0025 - Thermoplastic 12" Limit Line (White)
- 0026 - Thermoplastic 12" Limit Line (Yellow)
- 0027 - Thermoplastic Ladder Crosswalk (White)
- 0028 - Thermoplastic Ladder Crosswalk (Yellow)
- 0029 - Thermoplastic Pavement Marking
Plans & Specifications:
- Available for review at our office (Santa Rosa)
- Access contract documents via (Project overview)
How We Support You: Argonaut Constructors is committed to promoting diversity and assisting DBE/WBE/MBE firms by offering the following support:
- Assistance with bid preparation and scope clarifications
- Help with bonding, insurance, and technical requirements
- Breaking work into smaller, manageable packages
For questions or additional details, contact:
Tommy Doherty (Estimator)
Email: tdoherty@argonautconstructors.com and estimating@argonautconstructors.com
Phone: (707) 542-4862
Requirements:
- Insurance with Argonaut as Additional Insured
- Payment & Performance Bonds may be required for contracts over $25,000
- Union participation required for non-signatory subcontractors
Equal Opportunity Employer
All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
Argonaut Constructors, Inc.
360 Sutton Place, Santa Rosa, CA 95407
Phone: (707) 542-4862
Fax: (707) 542-4897
Contact: Adrianna Wagner, Bid Administrator
Email: awagner@argonautconstructors.com |