www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date September 12, 2022 @ 4:00 p.m. through bid opening date

License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665

ALL POTENTIAL SUBCONTRACTORS
*********************************************************************************
     THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE subcontractors, suppliers & truckers for the following project: 

Agency: Caltrans No. 01-366004
Construction on State Highway in Humboldt County Near Eureka from Eureka Slough Bridge to Bayside Cutoff
Project City, State: Eureka, CA
County: Humboldt County
DBE Goal: 20%
Bids open Tuesday, October 4, 2022, at 2:00 PM
General work description:  Construct interchange, structure undercrossing and traffic signal.
Plans & Specs: https://tpcorp.box.com/s/ss0s3mgy1qg4uuzg5uy2ruh6mrgq6t9h

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Ls), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Tape), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign Systems (Ls), Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Alternative Temporary Crash Cushion, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Erosion Control Blanket, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Active Treatment System, Temporary Concrete Washout, Treated Wood Waste, Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Com) (Aerially Deposited Lead), Shoulder Backing, (F) - Structure Excavation (Bridge), (F) - Structure Excavation (Retaining Wall), Structure Excavation (Type Z-2) (Aerially Deposited Lead), (F) - Structure Backfill (Bridge), (F) - Structure Backfill (Retaining Wall), Imported Borrow (Cy), Imported Crushed Rock, Place State Furnished Lightweight Fill (Eps Block), Lightweight Fill (Eps Block), Column Supported Embankment Columns, Column Supported Embankment Load Transfer Platform, Column Supported Embankment Movement Monitoring, Roadside Clearing, Soil Amendment, Packet Fertilizer, Plant (Group A), Plant (Group B), Plant Establishment Work, Wood Mulch, Foliage Protector, Temporary Irrigation System, Move-In/Move-Out (Erosion Control), Hydraulic Biotic Growth Medium, Fiber Reinforced Matrix, Fiber Rolls, Compost Berm, Permanent Erosion Control Establishment Work, Class 2 Aggregate Base (Cy), Replace Asphalt Concrete Surfacing, Hot Mix Asphalt (Type A), Hot Mix Asphalt (Leveling), Asphalt Binder (Geosynthetic Pavement Interlayer), Geosynthetic Pavement Interlayer (Paving Fabric), Data Core, Place Hot Mix Asphalt Dike (Type E), Tack Coat, Cold Plane Asphalt Concrete Pavement, Remove Base And Surfacing, Furnish 24" Cast-In-Steel Shell Concrete Piling, Drive 24" Cast-In-Steel Shell Concrete Pile, Prestressing Cast-In-Place Concrete, (F) - Structural Concrete, Bridge Footing, (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Retaining Wall, (F) - Structural Concrete, Approach Slab (Type N Modified), (F) - Structural Concrete, Headwall, (F) - Structural Concrete, Drainage Inlet, (F) - Concrete Surface Texture (Bird Motif), Joint Seal (Mr 1/2"), (F) - Bar Reinforcing Steel (Bridge), (F) - Bar Reinforcing Steel (Retaining Wall, Epoxy Coated), (F) - Bar Reinforcing Steel (Epoxy Coated) (Bridge), Public Safety Plan, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, (F) - Place Polyester Concrete Overlay, 18" Alternative Pipe Culvert, 24" Alternative Pipe Culvert, 24" Temporary Culvert, 8" Temporary Culvert, Temporary Drainage Inlet, 8" Perforated Plastic Pipe Underdrain, 18" Welded Steel Pipe Casing (Bridge), 24" Alternative Flared End Section, Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Curb) (Cy), Detectable Warning Surface, Minor Concrete (Sidewalk), (F) - Miscellaneous Iron And Steel, Prepare And Stain Concrete, Obliterate Surfacing, Chain Link Fence (Type Cl-4, Slatted), Reconstruct Chain Link Fence, Remove Pavement Marker, Pavement Marker (Retroreflective), Milepost Marker, Object Marker (Type P), Remove Roadside Sign, Remove Roadside Sign Panel, Relocate Roadside Sign-One Post, Relocate Roadside Sign-Two Post, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Roadside Sign Panel On Existing Post, Furnish Laminated Wood Box Post (Type L), Midwest Guardrail System, Vegetation Control (Minor Concrete), High-Tension Cable Barrier (4-Strand), Transition Railing (Type Wb-31), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal System, (F) - California St-75 Bridge Rail (Modified), Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken, 12-3), 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility) (Broken 8- 4), 8" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 6" Rumble Strip (Asphalt Concrete Pavement), 12" Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction, Lighting System, Signal And Lighting System, Traffic Monitoring Station System, Changeable Message Sign System, Modifying Lighting Systems, Modifying Traffic Monitoring Stations, Removing Lighting Systems, Removing Traffic Monitoring Stations, Removing Flashing Beacon Systems, Removing Changeable Message Sign Systems, Removing Radar Speed Feedback Sign Systems, 4" Conduit (Bridge), Gasoline Resistant Geomembrane, Mobilization.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding.

Thompson Builders Corporation is an Equal Opportunity Employer
 Contact:  Shannon Miller
PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Published on September 12, 2022 @ 4:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME