www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date August 28, 2025 @ 3:58 p.m. through bid opening date

GUY F. ATKINSON CONSTRUCTION, LLC

Requests
Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers/Consultants
for:

Caltrans Contract 12-0K62U4

Construction on State Highway in Orange County in Irvine and Tustin

From Yale Avenue Overcrossing to Route 5/55 Separation

12-Ora-5-R25.8/30.3

Bids Thursday, October 2, 2025

Scopes of Work: Aggregate, Asphalt, Bridge Barrier, Bridge Joint Seal, Clearing & Grubbing, Concrete Pavement Grinding, Concrete Paving Supply, Concrete Suppliers – Ready Mix, Construction Area Signs, Crushing, Demolition, Drilled Piles, Driven Piles, Electrical, Erosion Control, Erosion Control Materials, Fencing and Guardrail, Flatwork, Form Liner, Geo Fabric & Bond Breaker; Ground Anchors, Joint Seal Supply, Landscaping, Masonry, Metal Pipe, Misc. Iron & Steel (Bridge), Misc. Iron & Steel (Drainage), Monitoring, OHSS (Furnish & Install), OHSS (Supply Only), Painters, Pavement Marking, Pile Supply, Potholing, Precast Girders, QA/QC and Testing, Rebar, Reinforced Concrete Pipe, Roadway Barrier, Roadway Signs, Saw & Seal, Street Sweeping, Surveying, SWPPP, Traffic Control, Traffic Control Materials, Trucking, Welded Steel Pipe.

Services Needed Include (but are not limited to):  Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Safety Quality Control Manager, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Type Ii Barricade, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Barrier System, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ea), Temporary Crash Cushion Module, Temporary Crash Cushion Tl-2, Temporary Crash Cushion Tl-3, Temporary Traffic Screen, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Stormwater Sampling And Analysis Day, Stormwater Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Soil Binder, Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Manage Solid Waste Generated By The Public, Treated Wood Waste, Invasive Species Control, Noise Monitoring, Crack Monitoring, Vibration Monitoring, Photo And Video Site Documentation Of Existing Non-Highway Facilities, Remove Concrete (Miscellaneous) (Sqft), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Dust Palliative, Roadway Excavation, (F) - Structure Excavation (Bridge), (F) - Structure Excavation (Culvert), (F) - Structure Excavation (Retaining Wall), (F) - Structure Excavation (Sound Wall), (F) - Structure Backfill (Bridge), (F) - Structure Backfill (Culvert), (F) - Structure Backfill (Retaining Wall), (F) - Structure Backfill (Sound Wall), (F) - Pervious Backfill Material (Retaining Wall), Ditch Excavation, Imported Borrow (Cy), Roadside Clearing, Iron Sulfate (Lb), Soil Amendment, Slow-Release Fertilizer, Plant (Group H), Plant (Group K), Plant (Group Z) (Ea), Plant (Group A), Plant (Group B), Maintain Existing Planted Areas, Plant Establishment Work, Wood Mulch, Edging, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors (Armor-Clad), 1" Remote Control Valve, 1 1/2" Remote Control Valve, 2" Remote Control Valve, 3" Remote Control Valve, 3" Wye Strainer Assembly, Two-Wire Irrigation Controller, Recycled Water Identification And Warning Signs, (F) - 2" Galvanized Steel Pipe (Supply Line), (F) - 2 1/2" Galvanized Steel Pipe (Supply Line), Irrigation Controller Enclosure Cabinet, 3" Backflow Preventer Assembly, Backflow Preventer Enclosure, Flow Sensor, Tree Well Sprinkler Assembly, Riser Sprinkler Assembly (Gear Driven), Pop-Up Sprinkler Assembly (Gear Driven), Riser Sprinkler Assembly, Pop-Up Sprinkler Assembly, 2 1/2" Gate Valve, 3" Gate Valve, (F) - 3/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Class 315) (Supply Line), (F) - 3" Plastic Pipe (Class 315) (Supply Line), High Density Polyethylene Pipe Conduit, Quick Coupling Valve, Hydroseed, Compost (Cy), Incorporate Materials, Finishing Roadway, Class 3 Aggregate Subbase, Class 2 Aggregate Base (Cy), Lean Concrete Base, Lean Concrete Base Rapid Setting, Base Bond Breaker, Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Pavement (Sqft), Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), Drill And Bond (Dowel Bar), Isolation Joint Seal (Silicone), Remove Concrete Pavement (Sqyd), Ground Anchor (Vertical), Furnish Steel Piling (Hp 14 X 89), Drive Steel Pile (Hp 14 X 89), 24" Cast-In-Drilled-Hole Concrete Piling, 72" Cast-In-Drilled-Hole Concrete Piling, 90" Cast-In-Drilled-Hole Concrete Piling, 16" Cast-In-Drilled-Hole Concrete Piling (Barrier), 16" Cast-In-Drilled-Hole Concrete Piling (Sound Wall), 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), 72" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), 24" Cast-In-Drilled-Hole Concrete Piling (Retaining Wall), (F) - Structural Concrete, Bridge Footing, (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Retaining Wall, Aggregate Base (Approach Slab), (F) - Structural Concrete, Approach Slab (Type N), Structural Concrete, Approach Slab (Type R), (F) - Structural Concrete, Box Culvert, (F) - Structural Concrete, Headwall, (F) - Structural Concrete, Drainage Inlet, (F) - Minor Concrete (Minor Structure), Concrete Surface Texture (Fractured Rib), Drill And Bond Dowel, Drill And Bond Dowel (Chemical Adhesive)(Lf), Clean Expansion Joint, Furnish Precast Prestressed Concrete Girder (70'-80'), Furnish Precast Prestressed Concrete Girder (80'-90'), Furnish Precast Prestressed Concrete Girder (90'-100'), Furnish Precast Prestressed Concrete Girder (100'-110'), Erect Precast Prestressed Concrete Girder, Joint Seal (Mr 1"), (F) - Bar Reinforcing Steel (Bridge), (F) - Bar Reinforcing Steel (Retaining Wall), (F) - Bar Reinforcing Steel (Sound Wall), (F) - Bar Reinforcing Steel (Epoxy Coated), (F) - Bar Reinforcing Steel (Box Culvert), (F) - Bar Reinforcing Steel (Galvanized), (F) - Headed Bar Reinforcement, (F) - Furnish Sign Structure (Truss), (F) - Furnish Sign Structure (Bridge Mounted Without Walkway), (F) - Install Sign Structure (Bridge Mounted Without Walkway), Furnish Sign Structure (Versatile Truss), Install Sign Structure (Versatile Truss), Remove Sign Structure Walkway (Ea), Remove Sign Structure (Ea), Remove Bridge Mounted Sign, Modify Sign Structure, (F) - Sound Wall (Masonry Block), Remove Retaining Wall (Lf), Remove Property Wall, Remove Sound Wall (Lf), Refinish Concrete Surface, Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Bridge Removal (Portion), Location C, Bridge Removal (Portion), Location D, Bridge Removal (Portion), Location E, Bridge Removal (Portion), Location F, Bridge Removal (Portion), Location G, Bridge Removal (Portion), Location H, Bridge And Ground Anchor Wall Monitoring, Pumping Plant Monitoring, 18" Plastic Pipe, 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, 30" Reinforced Concrete Pipe, 36" Reinforced Concrete Pipe, 12" Corrugated Steel Pipe (.079" Thick), Drainage Inlet Marker, Grated Line Drain, 48" Corrugated Steel Pipe Riser (.109" Thick), 10" Welded Steel Pipe Casing (Bridge), 12" Welded Steel Pipe Casing (Bridge), 18" Concrete Flared End Section, 24" Concrete Flared End Section, 24" Precast Concrete Pipe Manhole, 36" Precast Concrete Pipe Manhole, Abandon Culvert (Lf), Remove Grated Line Drain, Remove Pipe (Lf), Remove Inlet, Remove Headwall, Adjust Inlet, Cap Inlet, Sand Backfill, Remove Concrete Ditch, Concrete (Ditch Lining), Slope Paving (Concrete), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Gutter) (Lf), Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Stamped Concrete), Remove Concrete Curb (Lf), Remove Concrete Sidewalk (Sqyd), Remove Concrete (Curb And Gutter), Pre/Post Construction Surveys, (F) - Miscellaneous Iron And Steel, (F) - Isolation Casing (Non-Corrugated Steel Pipe), (F) - Miscellaneous Metal (Bridge), (F) - Bridge Deck Drainage System, (F) - Anti-Graffiti Coating, Temporary Fence (Type Cl-6), Chain Link Fence (Type Cl-6), 3' Chain Link Gate (Type Cl-6), Remove Chain Link Fence, Remove Pavement Marker, Delineator (Class 1), Guard Railing Delineator, Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Remove Roadside Sign, Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Sign From Sign Frame, Furnish Laminated Panel Sign (1"-Type A), Furnish Laminated Panel Sign (1"-Type B), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Metal (Roadside Sign), Metal (Barrier Mounted Sign), Metal (Wall Mounted Sign), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Sign (Acrylic Foam Tape Method), Install Sign Panel On Existing Frame, Install Roadside Sign Panel On Existing Post, Install Roadside Sign (Laminated Wood Box Post), Furnish Laminated Wood Box Post (Type L), Midwest Guardrail System (Wood Post), Concrete Barrier (Type 60Mg Modified), Concrete Barrier (Type 836Sv Modified), (F) - Cable Railing, Transition Railing (Type Agt), End Cap (Type A), End Anchor Assembly (Type Sft-M), Alternative Crash Cushion Tl-2, Alternative In-Line Terminal Tl-3, Severe-Duty Crash Cushion Tl-3, Concrete Barrier (Type 60M), Concrete Barrier (Type 60Md), Concrete Barrier (Type 60Mg), Concrete Barrier (Type 60Mgc), Concrete Barrier (Type 60Mgf), Concrete Barrier (Type 60Ms), Concrete Barrier (Type 60Msc), Concrete Barrier (Type 60Mp), Concrete Barrier (Type 60Mga Modified), Concrete Barrier (Type 60Pr), Concrete Barrier (Type 836S Modified), Concrete Barrier (Type 836S), (F) - Concrete Barrier (Type 836Sv), (F) - Concrete Barrier (Type 836), (F) - Concrete Barrier (Type 836A), (F) - Concrete Barrier (Type 836B), (F) - Concrete Barrier (Type 842 Modified), Remove Guardrail, Remove Concrete Barrier, Remove Crash Cushion, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Preformed Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 6- 1), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), Paint Traffic Stripe (2-Coat), Paint Pavement Marking (2-Coat), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 8- 4), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Painted Traffic Stripe, Remove Painted Pavement Marking, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), 8" Traffic Stripe Tape With Contrast (Warranty) (Broken 12-3), 12" Traffic Stripe Tape With Contrast (Warranty), Contrast Stripe Paint (2-Coat), 6" Traffic Stripe Tape (Warranty) (Broken, 36-12), 6" Traffic Stripe Tape With Contrast (Warranty), 6" Traffic Stripe Tape With Contrast (Warranty) (Broken 17-7), 6" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12), 8" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12), Maintaining Existing Traffic Management System Elements During Construction, Inductive Loop Detector (Ls), Electric Service For Irrigation, Traffic Census Station Systems, Temporary Changeable Message Sign System, Fiber Optic Cable Systems, Modifying Fiber Optic Cable Systems, Temporary Lighting Systems, Temporary Signal Systems, Temporary Ramp Metering Systems, Temporary Camera Systems, Temporary Traffic Monitoring Stations, Temporary Fiber Optic Cable Systems, Modifying Camera Systems, Modifying Lighting Systems, Modifying Sign Illumination Systems, Modifying Signal And Lighting Systems, Modifying Ramp Metering Systems, Modifying Traffic Monitoring Stations, Modifying Changeable Message Sign Systems, Removing Ramp Metering Systems, QA/QC/Testing, Trucking, Super 10s, End Dumps, Double Bottoms, Survey.

REFER TO PROJECT SPECS AND ANY ADDENDA FOR COMPLETE BID ITEM LIST

ENGINEER’S ESTIMATE is $170,000,000

21% DBE Project Goal

*****Lower Tier DBE participation is greatly encouraged*****

Guy F. Atkinson Construction, LLC
611 Anton Blvd, Suite 1100, Costa Mesa, CA  92626
Contractor’s License # 1004388
socal.estimating@atkn.com
Phone:  949-382-7145  /  Fax:  949-769-5600

Guy F. Atkinson Construction, LLC is a union contractor and an Equal Opportunity Employer.  Atkinson is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers Unions. 100% Performance & Payment Bonds from an approved surety company will be required for subcontractors with contract value greater than $100,000.  Atkinson will pay the cost of bonds.  Atkinson will assist in obtaining necessary equipment, supplies, materials or related assistance or services.  We will split items of work (see project specs for full list of bid items) and provide assistance for bonding, LOC and insurance where needed.  Subcontractors will be expected to sign Atkinson's standard subcontract and to comply with our company's standard insurance requirements which include a waiver of subrogation.  Please provide contractor's license number, Department of Industrial Relations (DIR) registration number and DBE cert # (if applicable) with your quote. 

Atkinson requests that subs and vendors register in Building Connected and subs prequalify or update in TradeTapp, our online platform prior to bidding.

TO DOWNLOAD PLANS, SPECS, THE INFO HANDOUT, ETC and VIEW Q&A:  Please go to the Caltrans Contracts web site: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project-calendar.php?q=12-0K62U4

OR CONTACT ATKINSON to access all bid documents through our online platform, BuildingConnected.

Please contact Atkinson with any questions or for help with your bid.

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME