www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date August 16, 2021 @ 10:00 a.m. through bid opening date

 

Caliba Inc. is seeking qualified DVBE subcontractors, suppliers for the Leuzinger High School Athletic Facilities Improvements Project

Bid Date and Time:

August 19, 2021 at 2:00 PM

Project Owner:

Centinela Valley Union High School District (CVUHSD) Bid Packae 01

Project:

Leuzinger High School Athletic Facilities Improvements Project

Wage Determination

Prevailing Wage

Contact:

Ces Pavia

Email Address:

bidding@calibainc.com

Estimator's Phone:

(714) 886-2887

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

https://drive.google.com/drive/folders/1gfb4M-JVmRzVtuGu3VOh8geR-dfZspVH?usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Temporary Fencing, Security, Portable Toilet Service & Trash Receptacles, Trash Dumpsters, Labor Support, Final Clean-up, Casework and Lockers, Joint Sealant, Joint Sealant at Existing Hard surface, Hollow Metal Doors. Frames & Hardware, Hollow Metal Doors. Frames & Hardware, Access Doors, Flooring, Tile Grout, Tiling Slope Test, Non-Structural Metal Framing. Gypsum Board. Lath and Plaster, Paint, High Performance Coatings, Specialties, Signage, Toilet Compartments/Partitions, Toilet and Bath Accessories, Fire Protection Specialties, Roller Window Shades, Entrance Floor Mats and Frames, Marker board, Rough Carpentry, Fire Rated Penetrations & Site Furnishings.

Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.


Caliba Inc.
8031 Main Street, Stanton, CA 90680
An Equal Opportunity Employer

Published on August 16, 2021 @ 10:00 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME