www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date August 4, 2026 @ 7:06 a.m. through bid opening date

The Dutra Group
An Equal Opportunity Employer
Is requesting quotations from all qualified SBE/DBE, SWaM-certified sub-contractors and material suppliers
performing commercially useful functions for the following project:

Project: Norfolk International Terminals (NIT) – North Container Terminal Dredging
Owner/Agency: Virginia Port Authority
IFB Number: 2026-36-VPA
Bid Date/Time: August 11, 2026, at 2:00 PM
Plans & Specifications:
https://mvendor.cgieva.com/Vendor/public/AllOpportunities.jsp

Project Summary: The purpose of this Invitation for Bids (IFB) is to solicit bids to establish a Contract through competitive sealed bids for dredging within the existing berth and access channel of Norfolk International Terminals (NIT) North Container Terminal, encompassing maintenance dredging to a depth of -52’Mean Lower Low Water (MLLW and new work dredging to a maximum depth of -57’ MLLW).

Requested Quotes
The Dutra Group is requesting quotations from qualified subcontractors and suppliers, including SBE/DBE, SWaM-certified firms, for work including, but not limited to:

  • Surveying & Mapping
  • Environmental Consulting
  • Laboratory Testing
  • SWPPP / Stormwater Compliance
  • Demolition
  • Excavation
  • Utility Disconnect/Reconnect
  • Fuel Supply
  • Electrical
  • Trucking & Hauling
  • Heavy Equipment Rental
  • Construction Materials & Supplies
  • Steel Supply & Fabrication

Assistance Available
Our estimators are available to assist interested firms with:

  • Interpreting plans and specifications
  • Defining the scope of work
  • Bonding requirements
  • Lines of credit
  • Insurance requirements

The Dutra Group is committed to maximizing subcontractor participation. Our estimators are available to assist interested firms with interpreting the plans and specifications, defining the scope of work, and addressing questions regarding bonding, lines of credit, and insurance requirements. Work has been divided into economically feasible units whenever possible to encourage subcontracting opportunities.

Contact Information
Nick Maurer
The Dutra Group
Phone: (415) 258-6876
Fax: (415) 459-3295
Email: nmaurer@dutragroup.com

Information on this project may be viewed through our office. Please contact
estimating@dutragroup.com for more information.

Prevailing Wage
We bond all subs; USLH insurance will be required for all work over or near water.
This is a federal-aid project subject to equal employment opportunity provisions.

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME