
Armstrong Cal Builders Inc. An Equal Opportunity Employer is seeking qualified DVBE subcontractors, suppliers for the following project.
Bid Date and Time: |
Friday, August 7, 2026 @ 10:00 AM |
Project Owner: |
Pomona Unified School District |
Project: |
Renovation of Science Labs at Garey High School – Re-Bid #2 |
Wage Determination |
Prevailing Wage |
Location: |
Garey High School, Pomona, Los Angeles County, California |
Contact: |
Bidding Dept. |
Email Address: |
bidding@armstrongcalbuilders.com |
Estimator's Phone: |
(657) 332-2300 |
Participation |
3% DVBE Participation |
Plans and Specs Link: |
Sub Folder |
Please see the NIB or Specification section for the subcontractor’s prequalification requirements.
General work description: The project consists of a complete renovation of two science laboratories (Rooms 112 and 113) at Garey High School to bring them into compliance with current fire/life safety and ADA accessibility standards.
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Demolition, Concrete (Minor Patching), Metal Stud Framing, Drywall, Acoustical Ceilings, Painting, Flooring, Laboratory Casework, Fume Hood Supplier, Plumbing, Medical/Laboratory Gas Piping, HVAC, Electrical, Fire Alarm, Low Voltage, Audio/Visual Systems, Data/Communications, Roofing/Patching (If Required), Doors, Frames & Hardware, Finish Carpentry, Specialties, Equipment Installation, Final Cleaning. See Specs for Complete list of bid items.
Armstrong Cal Builders Inc. requires 100% Performance & Payment Bonds. If requested, and as Armstrong Cal Builders Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Armstrong Cal Builders Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Armstrong Cal Builders Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications, and addenda regardless of any qualifying language in the proposal. Armstrong Cal Builders Inc. listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.
Each listed subcontractor must execute Armstrong Cal Builders Inc. standard subcontract agreement if Armstrong Cal Builders Inc. is awarded the project; the standard subcontract is available for review at Armstrong Cal Builders Inc. office. At the discretion of Armstrong Cal Builders Inc. any listed subcontractor that withdraws its bid after Armstrong Cal Builders Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work.
This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.
Armstrong Cal Builders Inc.
Office Number: 657-332-2300
License No.: B 990992
An Equal Opportunity Employer |