www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

Advertisement date: July 10th, 2019 @ 4:00 p.m. through bid opening date

Caliba Inc.

Caliba Inc. is seeking qualified subcontractors, suppliers and DVBE firms to meet or exceed the 3% goal for the Santana Student Support Service Modification Project.

Bid Date and Time:

July 23, 2019 @ 2:00 PM

Project Owner:

Grossmont Union High School District

Engineer’s Estimate:

$3,100,000

Wage Determination

State Prevailing Wage

Contact:

Sally Abosalama

Email Address:

bidding@calibainc.com

Estimator's Phone:

(714) 699-5280 or (714) 699-5213

Estimator’s Fax:

(714) 947-1022

Plans and Specs Link:

https://bit.ly/32i5qf0

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Scope: Complete interior remodel of existing administration building. Modernization of Admin. Building (Cert. A#04 24994). Type V-B wood construction. B occupancy 6,917 sf with a 425 sf addition. 16’ max. building height. Non Sprinklered adjacent site improvements.

Trades: Demolition, Concrete, Rebar, Steel, Rough Carpentry, Casework, Waterproofing, insulation, Roofing, Sheet Metal, Roof access, Joint Sealants, Doors, Frames & Hardware, Glass and Glazing, Plastering, Gypsum Board, Tile, Acoustical Ceilings, Flooring, Painting, Wall Covering, Signage, Toilet and Compartments, Projector Screens, Window Treatment, Plumbing, HVAC, Electrical, Communications, Site Concrete, Ornamental Fences and Gates, Site Utilities, Sewer

Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.

An Equal Opportunity Employer
Bidding Department
Caliba Inc.
6942 Steeplechase Cir., Huntington Beach, CA 92648

Published on July 10th, 2019 @ 4:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

 
What are we about? Contact us HOME