www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

Advertisement date July 3rd, 2019 @ 1:47 p.m. through bid opening date

250 Bel Marin Keys Boulevard, Building A
Novato, CA 94949
General Contractor License # 626859

 

ALL POTENTIAL DVBE/SB-DVBE/SBE SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from DVBE/SB-DVBE/SBE subcontractors, suppliers & truckers for the following project.
Central Plant and Chilled Water Infrastructure Project
Department of Veterans Affairs

Project Nos. 132106 & 132594
Owner: State of California, Department of General Services
Bid Date: 7/11/2019 @ 2:00 PM

New Bid Date: 7/23/2019 @ 2:00 PM Estimate: $20,197,000

*** Addendums 1-4 have been issued***

Seeking DVBE/SB-DVBE/SBE subcontractors/suppliers/truckers.TRADES NEEDED (but not limited to):

SECTION 02 26 00 EXISTING CONDITIONS - HAZARDOUS MATERIAL ASSESSMENT
SECTION 02 41 19 SELECTIVE DEMOLITION
SECTION 02 80 01 HAZARDOUS MATERIALS ABATEMENT WORK PLAN
SECTION 02 83 33 REMOVAL AND DISPOSAL OF MATERIAL CONTAINING LEAD
SECTION 02 84 33 REMOVAL AND DISPOSAL OF PCB AND MERCURY CONTAINING MATERIALS
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
SECTION 05 12 00 STRUCTURAL STEEL FRAMING
SECTION 05 52 13 PIPE AND TUBE RAILINGS
SECTION 05 53 16 PLANK GRATINGS
SECTION 06 10 00 ROUGH CARPENTRY
SECTION 06 16 00 SHEATHING
SECTION 07 51 13 BUILT-UP ASPHALT ROOFING
SECTION 07 71 00 ROOF SPECIALTIES
SECTION 07 72 00 ROOF ACCESSORIES
SECTION 08 91 19 FIXED LOUVERS
SECTION 09 29 00 GYPSUM BOARD
SECTION 09 67 23 RESINOUS FLOORING
SECTION 09 84 33 SOUND-ABSORBING WALL UNITS
SECTION 09 91 13 EXTERIOR PAINTING
SECTION 09 91 23 INTERIOR PAINTING
SECTION 22 11 16 DOMESTIC WATER PIPING
SECTION 22 31 00 DOMESTIC WATER SOFTENERS
SECTION 22 33 00 ELECTRIC, DOMESTIC WATER HEATERS
SECTION 22 45 00 EMERGENCY PLUMBING FIXTURES
SECTION 23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
SECTION 23 05 16 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 23 05 19 METERS AND GAGES FOR HVAC PIPING
SECTION 23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING
SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC
SECTION 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC
SECTION 23 07 00 INSULATION
SECTION 23 07 16 HVAC EQUIPMENT INSULATION
SECTION 23 07 19 PIPING INSULATON
SECTION 23 08 00 COMMISSIONING OF HVAC
SECTION 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
SECTION 23 09 39 INSTRUMENTATION AND CONTROL FOR BOILER SYSTEMS
SECTION 23 11 13 FACILITY FUEL-OIL PIPING
SECTION 23 11 23 FACILITY NATURAL-GAS PIPING
SECTION 23 21 13 HYDRONIC PIPING
SECTION 23 21 18 HYDRONIC PIPING (UNDERGROUND)
SECTION 23 21 23 HYDRONIC PUMPS
SECTION 23 22 13 STEAM AND CONDENSATE HEATING PIPING
SECTION 23 25 00 HVAC WATER TREATMENT
SECTION 23 25 16 CONDENSER WATER TREATMENT
SECTION 23 31 13 METAL DUCTS
SECTION 23 34 16 CENTRIFUGAL HVAC FANS
SECTION 23 51 00 BREECHINGS, CHIMNEYS AND STACKS
SECTION 23 52 39 FIRE-TUBE BOILERS
SECTION 23 53 16 DEAERATORS-FEEDWATER PACKAGES
SECTION 23 64 00 PACKAGED CHILLER PLANT
SECTION 23 65 00 COOLING TOWERS
SECTION 26 05 13 MEDIUM-VOLTAGE CABLES
SECTION 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
SECTION 26 05 23 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
SECTION 26 05 48.16 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 26 05 72 OVERCURRENT PROTECTIVE DEVICE SHORT-CIRCUIT STUDY
SECTION 26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
SECTION 26 05 73.13 SHORT-CIRCUIT STUDIES
SECTION 26 05 73.19 ARC-FLASH HAZARD ANALYSIS
SECTION 26 05 74 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY
ECTION 26 11 16 SECONDARY UNIT SUBSTATIONS
SECTION 26 22 00 LOW-VOLTAGE TRANSFORMERS
SECTION 26 24 13 SWITCHBOARDS
SECTION 26 24 16 PANELBOARDS
SECTION 26 27 26 WIRING DEVICES
SECTION 26 28 13 FUSES
SECTION 26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
SECTION 26 29 13 ENCLOSED CONTROLLERS
SECTION 26 29 23 VARIABLE-FREQUENCY MOTOR CONTROLLERS
SECTION 26 30 10 CHILLED WATER PUMP PANEL
SECTION 26 30 20 CHILLED WATER CIRCULATION PUMP PANEL
SECTION 26 32 13 ENGINE GENERATORS
SECTION 26 36 00 TRANSFER SWITCHES
SECTION 26 51 16 FLUORESCENT INTERIOR LIGHTING
SECTION 26 52 19 LED INTERIOR LIGHTING
SECTION 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS
SECTION 31 10 00 SITE CLEARING
SECTION 31 20 00 EXCAVATING, BACKFILLING AND COMPACTING FOR UTILITIES
SECTION 31 22 00 GROUNDWORK FOR STRUCTURES
SECTION 31 23 00 EXCAVATION AND FILL
SECTION 32 05 00 GENERLA REQUIREMENTS FOR GARDING AND PAVING
SECTION 32 10 10 TRENCH RESURFACING
SECTION 32 11 23 AGGREGATE BASE
SECTION 32 12 16 ASPHALT CONCRETE PAVEMENT
SECTION 32 13 13 CONCRETE PAVEMENT, SIDEWALKS, CURBS AND GUTTERS
SECTION 32 31 13 CHAIN LINK FENCES
SECTION 33 10 00 FACILITY WATER DISTRIBUTION
SECTION 33 30 00 FACILITY SANITARY SEWERS
SECTION 33 46 00 SUBDRAINAGE

Please submit bids to us by noon on bid day.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday through Friday from 7:30 AM to 4:30 PM. Plans and specifications may be emailed upon request or downloaded from the following link: https://tpcorp.box.com/s/st3xnox4aw6tm34txhgkett4lf672i9d


Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Sharyn Mitchell (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com

Published on July 3rd, 2019 @ 1:47 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

 
What are we about? Contact us HOME