www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date July 7 , 2026 @ 4:21 p.m. through bid opening date

License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665

THOMPSON BUILDERS CORPORATION is requesting bids from ALL LBE subcontractors, suppliers & truckers, for the following project:
Name of Project: Oceanside Water Pollution Control Plant Solids Thickening Process Upgrade
Owner: San Francisco Public Utilities Commission
Estimate: $10,500,000 – 12,500,000
Bid Date and Time: July 23rd, 2026 at 2:00PM
Good Faith Goals: LBE - 20%
Box Link: https://tpcorp.box.com/s/ml6i4vtpt5nciosv39cbytfaes9ft9c5

The work is to be performed in San Francisco, California.

We are committed to meeting SFPUC’s Local Business Enterprise (LBE) participation requirements and are actively seeking participation from SF CMD-certified LBE subcontractors and suppliers.

Quotes for Services and Supplies requested for the following items for bid including but not limited to: Price And Payment Procedures , Mobilization Item , Product Substitution Procedures , Schedule Of Valves , Project Management And Coordination , Project Meetings , Partnering Requirements , Third-Party Facilitator Agreement , Construction Progress Schedule , Submittal Procedures , Building-Related Hazardous Materials , Regulatory Requirements , References , Temporary Facilities And Controls , Field Offices , Temporary Noise And Vibration Controls , Product Requirements , Protection Of Adjacent Construction , Seismic Requirements For Mechanical And Electrical Equipment , Cutting And Patching , Material Reduction And Recovery Plan , Testing Coordination And Start-Up Testing Closeout Procedures , Operations And Maintenance Data , Warranties , Project Record Documents , Sp Are Units, Sp Are Parts, And Maintenance Materials , Concrete Rep Air , Concrete Forming And Accessories Concrete Reinforcement , Cast-In-Place Concrete Grounting , Post-Installed Concrete Anchors Structural Stainless Steel , Coating And Lining, Testing, Adjusting, And Balancing For Hvac , Shell And Tube Heat Exchanger , Hydronic Pumps , Fiberglass Reinforced Plastic (Frp) Ducts , Ductwork Accessories , Fiberglass Reinforced Plastic Fans And Mist Eliminator Air Terminal Units, Common Work Results For Electrical , Electrical Selective Demolition And Modifications Low Voltage Electrical Power Conductors And Cables Grounding And Bonding For Electrical Systems Raceway And Boxes For Electrical Systems , Excavation And Backfilling Dewatering , Piping General , Piping Identification , Piping Systems Testing , Piping Insulation , Pipe Supports , Ductile Iron Pipe , St Ainlesss Steel Process Piping , Plastic Piping And Tubing , Plastic Valves , Process Valves , Valve Actuators , Process And Facility Control System Testing Instrumentation For Process System , Common Work Results For Instrumentation And Control Systems (Ics) , Control Panel Construction , Programmable Logic Controller (Plc) , Control Strategy , Additional Scope Of Control Work Required By The System Integrator , Sump Pumps , Rotary Drum Thickening Equipment Please review plans & specs for complete list of bid items

We are willing to break out work items into smaller, economically feasible packages to encourage LBE participation and are available to assist interested firms with bid preparation, bonding, insurance, and technical requirements.

***An electronic version of the bidding forms, contract specifications, drawings, and available project information are available by request. To request these materials, email qbd@sfwater.org with this Contract No. WW-770, the firm name, full address, email address, phone number, copy of contractor’s license or business card, and a copy of a government-issued identification.”***

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Small businesses including DBE/WBE/MBEs are encouraged to look at Caltrans California Construction Contracting Program Website for possible bonding assistance.
https://buildcalifornia.com/

Thompson Builders Corporation
an Equal Opportunity Employer
Contact: Kelsey Heaphy
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL:  bids@tbcorp.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME