www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date June 29th, 2020 @ 9:30 a.m. through bid opening date

15148 Sierra Bonita Ln.
Chino, CA 91710
P : 909-457-8260

KASA Construction an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for referenced project:

Agency: Caltrans
Project No. 12-0N5304
Bid Opening Date: June 7, 2020 at 2 PM
Location: In Orange Country In Orange And Anaheim At Various Locations From 0.5 Mile North Of East La Veta Avenue Overcrossing To Route 55/91 Separation

Project Description: Planting, irrigation, rock blanket, minor concrete and access road.

KASA Construction Inc is requesting subcontractor and material supply quotes from DBE subcontractors and material suppliers to provide or perform goods and services for the following: ROCK BLANKET, LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGNS , JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY EROSION CONTROL, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD), ROADSIDE CLEARING, PLANT (GROUP H), PLANT (GROUP A), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, GRAVEL MULCH, WOOD MULCH, CONCRETE GRID PAVING UNITS, EDGING, CHECK AND TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, SALVAGE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1 1/2" REMOTE CONTROL VALVE, 2" REMOTE CONTROL VALVE, 2" GALVANIZED STEEL PIPE (SUPPLY LINE), RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), RISER SPRINKLER ASSEMBLY, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), BALL VALVE, PVC PIPE CONDUIT (SLEEVE), 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, 10" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, 10" WELDED STEEL PIPE CONDUIT, MINOR CONCRETE (STAMPED CONCRETE).

Plans & Specs can be viewed at our office or downloaded free of charge at:
http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php

Info: Hector Zavala is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance.KASA Construction may also assist in obtaining any necessary equipment, supplies, materials or related services.

The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors#

California Access to Capital Program Financing Solutions for your small business! http://www.calbizfinance.org/cal_cert_biz_program.html

SUBCONTRACTORS ARE REQUIRED TO MEET INSURANCE & LABOR & LICENSE REQUIREMENTS. QUOTES ARE REQUIRED TO BE IN ACCORDANCE WITH THE PLANS & SPECS & GOOD FOR THE DURATION AS SPECIFIED IN THE BID DOCS.

For any bid proposal submitted on or after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply:  Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (“Section 1725.5”).  No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5.  No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor’s current registration to perform public work pursuant to Section 1725.5.

 

Published on June 29th, 2020 @ 9:30 a.m.by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME