Advertisement date June 22nd, 2018 @ 11:13 a.m. through bid opening date

USS Cal Builders is seeking qualified subcontractors, suppliers and DBE firms to meet or exceed the 21%  goal for the Redondo Beach Transit Center Project, Job no. 20120

New Bid Date and Time:

July 19, 2018 @ 4:00 PM

Project Owner:

City of Redondo Beach

Engineer’s Estimate:

$6,000,000.00

Wage Determination

State Prevailing Wage, Federal Funding, Buy America

Estimator’s Name:

FERNANDO MARQUEZ

Email Address:

bidding@usscalbuilders.com

Estimator's Phone:

(714) 828-4882 Ext. 3

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

https://www.redondo.org/depts/public_works/engineering/cip_bid_opportunities.asp

PRE-QUALIFICATION REQUIREMENTS

 Scope: New construction of a one-story type V-B Customer restrooms. Retail service, Office and Lounge with Restrooms. Building is a Fully Sprinklered. Kingsdale Avenue Street Widening.


Qualified subcontractors and suppliers including certified DBE firms are asked to submit quotes for all bid items including but not limited to the following trades: ABATEMENT, DEMOLITION,  UNIT MASONRY, METAL FABRICATIONS , DECORATIVE METAL, ROUGH CARPENTRY , FINISH CARPENTRY , ARCHITECTURAL WOOD CASEWORK, THERMAL INSULATION , WEATHER BARRIERS, METAL COMPOSITE MATERIAL WALL PANELS , FIBER CEMENT SIDING , BUILT-UP BITUMINOUS , SHEET METAL FLASHING AND TRIM, ROOF ACCESSORIES , JOINT SEALANT, HOLLOW METAL DOORS AND FRAMES , FLUSH WOOD DOORS , ACCESS DOOR AND PANELS , ALUMINUM-FRAMED STOREFRONTS , UNIT SKYLIGHTS , DOOR HARDWARE , GLAZING , , FINISH & AESTHIC SELECTIONS , GYPSUM BOARD ASSEMBLIES , METAL LATH , INTEGRAL COLOR PORTLAND CEMENT PLASTERING, TILING , ACOUSTICAL CEILINGS , PAINTING AND COATING, SINGAGE, PLATIC TOILET ACCESSORIES , TOILET ACCESSORIES , FIRE PROTECTION SPECIALTIES , , WINDOW SHADES , ENTRACNE FLOOR MATS , FURNITURE , SITE FURNISHINGS , RACKS, LOCKERS, AND SHADE COVERS FOR BICYCLES , , FIRE SPRINKLER SYSTEM, PLUMBING NOISE AND VIBRATION CONTROL , DOMENSTIC WATER SYSTEMS , DRAINAGE SYSTEMS , PLUMBING SPECIALTIES , PLUMBING FIXTURES , , GENERAL MECAHNICAL REQUIREMENTS , VIBRATION ISOLATION AND SEISMIC CONTROL , MECHANICAL BASE MATERIALS AND METHODS , AIR AND WATER TEST AND BALANCE , MECHANICAL SYSTEM INSULATION , MECHANICAL IDENTIFICATION , DUCTWORK , AIR MOVING EQUIPMENT , ROOFTOP PACKAGED AC UNITS, ELECTRICAL DESIGN CRITERIA , LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES , GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS , RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS , EXTERIOR PULLBOXES AND MANHOLES , VIBRATION AND SEISMIC CONTROLS, IDENTIFICATION FOR ELECTRICAL SYSTEMS , SHORT CIRCUIT AND COORDINATION STUDY , TESTING OF ELECTRICAL SYSTEM , LOW VOLTAGE DISTRIBUTION TRANSFORMERS , SWITCHBOARDS , PANELBOARDS , MOTOR CONTROLS , WIRING DEVICES , LIGHTING, , WI FI COMMUNICATIONS ACCESS , PUBLIC ACCESS SYSTEM , EMERGENCY PHONE, SECURITY SURVEILLANCE SYSTEM , FIRE ALARM AND DETRECTION SYSTEM, , SITE AND IFRASTRUCTURE, TERMITE CONTROL, DECORATIVE CONCRETE PAVEMENT , FENCING , AND GATES , PLANTING IRRIGATION , PLANTS, ROOT BARRIER , FACTORY FABRICATED LIVING WALL - METAL SYSTEM.

USS Cal Builders requires 100% Performance & Payment Bonds. If requested, and as USS Cal Builders way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for  information:  http://www.sba.gov/content/contractors#

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

An Equal Opportunity Employer.

Bidding Department
USS Cal Builders Inc.

8051 Main Street, Stanton, CA 90680

License # 654454

www.usscalbuilders.com

 

Published on June 22nd, 2018 @ 11:13 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 