www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date June 6, 2023 @ 4:00 p.m. through bid opening date

Armstrong Cal Builders Inc. An Equal Opportunity Employer is seeking qualified DVBE subcontractors, suppliers.
for the following project:


Bid Date and Time:

 

June 22, 2023, at 1:00 PM

Project Owner:

Centinela Valley Union High School District | Bid No. 23-001

Project:

Hawthorne HS Athletic Fields Modernization

Wage Determination

Prevailing Wage

Location:

Hawthorne High School

Contact:

Bidding Dept.

Email Address:

bidding@armstrongcalbuilders.com

Estimator's Phone:

(800) 291-7203

DBE

DVBE Participation goal 3%

Plans and Specs Link:

https://drive.google.com/drive/folders/1hQufmjy-RDGYBeB47wZPncVOHT805IUg?usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Armstrong Cal Builders Inc. will be bidding on Bid Package (BP01) Contract scope of work includes: all work required to furnish and install General Conditions/Requirements and various building components and finishes for the project, as shown in the Contract Drawings and all associated sheets, elevations, and details, and the methods and in the Primary and Related Specification Sections.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: BP 01 – General Conditions, Finishes and Specialties: COLD FORMED METAL FRAMING, ROUGH CARPENTRY, ARCHITECTURAL WOOD CASEWORK, FIBERGLASS REINFORCED PANELING, SHEET WATERPROOFING, THERMAL INSULATION, WEATHER BARRIERS, MODIFIED BUILT UP ROOF SYSTEM ,ROOF ACCESSORIES FIRESTOPPING, JOINT SEALANTS, HOLLOW METAL DOORS AND FRAMES, ACCESS DOORS AND PANELS, COILING COUNTER DOORS, OVERHEAD COILING DOORS,ALUMINUM FRAMED STOREFRONTS, SLIDING PASS WINDOWS, DOOR HARDWARE, GLAZING, LOUVERS, COMMON WORK RESULTS FOR FLOORING PREPARATION 092116 – GYPUSM BOARD ASSEMBLIES,  NON-STRUCTURAL METAL FRAMING, LATH, CEMENT PLASTERING, ACOUSTICAL CEILINGS, RESILIENT FLOORING, FLUID APPLIED FLOORING,  PAINTS AND COATING, HIGH PERFORMANCE COATINGS, PERMANENT NON-SACRIFICAL ANTI-GRAFFITI COATING 101100 – VISUAL DISPLAY UNIT,  SIGNAGE,  PHENOLIC TOILET COMPARTMENTS, WALL AND DOOR PROTECTION, TOILET, BATH AND LAUNDRY ACCESSORIES, FIRE PROTECTION SPECIALTIES, PHENOLIC LOCKERS, METAL STORAGE SHELVING, WINDOW SHADES, COUNTERTOPS, ENTRANCE FLOOR MATS AND FRAMES, ACCESS CONTROLS, SITE FURNISHINGS.

Armstrong Cal Builders Inc. requires 100% Performance & Payment Bonds. If requested, and as Armstrong Cal Builders Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Armstrong Cal Builders Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Armstrong Cal Builders Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Armstrong Cal Builders Inc. listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Armstrong Cal Builders Inc. standard subcontract agreement if Armstrong Cal Builders Inc. is awarded the project; the standard subcontract is available for review at Armstrong Cal Builders Inc. office. At the discretion of Armstrong Cal Builders Inc. any listed subcontractor that withdraws its bid after Armstrong Cal Builders Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.

Armstrong Cal Builders Inc.
Commercial & Residential Construction, Design Build
3130 E. Willow Street, Signal Hill, Ca 90755
Office: 800-291-7203
License No.: B 990992
An Equal Opportunity Employer

Published on June 6, 2023 @ 4:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME