Caliba Inc. is seeking qualified DVBE subcontractors, suppliers for the Lake Elsinore Unified School District Project: JEAN HAYMAN SITE, PHASE 2 – REMODEL OF BUILDINGS 3 & 4 - BID NO. 11-20/21

NEW Bid Date & Time:

June 8, 2021 at 2:00 PM

Project Owner:

Lake Elsinore Unified School District

Wage Determination

Prevailing Wage

Contact:

Ces Pavia

Email Address:

bidding@calibainc.com

Estimator's Phone:

(714) 886-2887

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

https://drive.google.com/drive/folders/1MM1cJMYltlnoBIQqrDvWT36bA5ZkpWZ?
usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Caliba Inc. an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for the following items of work, including but not limited to: Demo, Electrical, Mechanical, Plumbing, Doors, Frames & Hardwares, Signage, Ceiling, Toilet Fixtures & Accessories, Steel works, Painting, Structural Wood Framing, Low voltage, etc.

Scope of Work: Building 3 Tenant Improvements consisting of improvements to framing, plumbing, electrical,
low voltage, mechanical, etc. Building 4 electrical and low voltage improvements.

Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.


Caliba Inc.
8031 Main Street, Stanton, CA 90680

Published on May 27, 2021 @ 2:10 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 