Shimmick Construction Company, Inc. is requesting quotes from certified
SBE Subcontractors and Suppliers for the project
Agency: Santa Clara Valley Water District
Project: Coyote Creek Flood Protection, VW0593
Bid Date: Wednesday, June 24th, 2026, at 2:00PM
Quotes Due: Tuesday, June 23rd, 2026
Total Project Value: $140M-$160M
Bid Items: Shimmick Construction Company, Inc. is requesting quotes from certified Small Business, subcontractors and suppliers in the following scopes of work, including, but not limited to, the following. Please reach out to the lead estimator listed below for more details on scopes needed:
Subcontractors: Architectural, Barrier Rail, Bridge Rail-Concrete, Clear and Grub, Concrete – Cell Crete, Concrete – Building, Contaminated Soil, Coring, Crash Cushion, Deck- Refinishing, Demo, Dewatering, Drill – Bond, Earthwork, Electrical, Environmental, Erosion Control, Fence, Flatwork, Grinding – AC, Concrete, Grouting, Joint Seal, Landscape, Mechanical, Paving, Rebar, Shoring, Signs, Soil Cement, Soil Mix, Soil Stabilization, Survey, Pre-Con Property Surveyors, Noise & Vibration Monitoring, Biologist, Paleontologist, Tree Removal Sub.
Suppliers: Aggregate, Architectural items, Expansion Joints, Fabric, Falsework Material, Joint Seal, Lumber, Misc. Metal, Pipe-Sheet, Precast – Utility, Ready Mix, Steel – Fab, Utility Pipe – CMP, Utility Pipe - CSP, Utility Pipe - Plastic, Utility Pipe - Plate, Utility Pipe - DIP, Utility Pipe – Steel, Utility Pipe – VCP, Utility Pipe – RCP, Valves & Fittings, Controlled Low Strength Material, Sandbags, Water Truck, Rip Rap, Traffic Signs, Fence and Bollards
All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator for assistance with breaking down items of work into economically feasible units, assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or any additional assistance. Shimmick Construction’s listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote.
Plans and Specifications: Plans and specifications are available via PlanetBids: https://vendors.planetbids.com/portal/48397/bo/bo-detail/138008#bidInformation. You may also contact Julie White at julie.white@shimmick.comfor a download link to view plans and specifications or to schedule an appointment via Teams to discuss the documents. Meetings are held during regular business hours.
Shimmick Contacts: Should you require assistance with your bid, please contact our lead estimators Joe Shinagle at joe.shinagle@shimmick.com and Aaron Lai at alai@shimmick.com.
Additional Information: 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. For assistance with bonding, insurance or lines of credit contact Kevin Voong at kevin.voong@shimmick.com.
Shimmick Construction Company, Inc.
1 Harbor Center, Suite 200
Suisun City, CA 94585
Phone (707) 410-5070
An Equal Opportunity Employer |