
License# 171432
A California Company
In Business since 1957
An Equal Opportunity Employer.
Request for DBE/WBE/MBE Subcontractor & Supplier Quotes
Agency: Caltrans
Project Name: 04-2Q5204
Project ID.: 0419000021
Federal Aid No.: ACNH- P029(158)E
Location: State Highway In Solano County In Vallejo From 0.2 Mile North Of Route 80/ 29 Separation To Napa County Line
Engineer’s Estimate: $29,000,000
DBE Goal: 21%
Completion Time: Do not bid less than 160 working days and not more than 200 working days
Liquidated Damages: $13,200
Bid Date: 06.05.25
Submit Quotes by: NOON on Bid Date
Project Scope: We are seeking qualified DBE/WBE/MBE subcontractors and suppliers for work on this highway construction project, which includes:
Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Ls), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Portable Radar Speed Feedback Sign System, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ls), Job Site Management, Stormwater Pollution Prevention Plan, Stormwater Sampling And Analysis Day, Stormwater Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Silt Fence, Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Noise Monitoring, Vibration And Crack Monitoring, Photo And Video Survey Of Existing Non- Highway Facilities, Remove Brick Pavers, Salvage Bollard, Temporary High-Visibility Fence, Temporary Tree Protection, Clearing And Grubbing (Ls), Roadway Excavation, Ditch Excavation, Roadside Clearing, Rock Blanket (Type 2), Rock Blanket (Type 1), Bench, Remove Rock Blanket (Sqyd), Reset Tree Grate, Soil Amendment, Organic Fertilizer, Packet Fertilizer, Mycorrhizae Inoculant, Soil Aeration Tube, Soil Testing, Plant (Group U), Maintain Existing Planted Areas, Plant Establishment Work, Concrete Pavers, Decomposed Granite, Wood Mulch, Brick Pavers (Sqft), Root Barrier, Reset Existing Planter, Bike Rack, Temporary Irrigation System, Reset Trash Receptacle, Move-In/Move-Out (Erosion Control), Hydromulch, Fiber Rolls, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Data Core, Tack Coat, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement, (F) - Structural Concrete, Drainage Inlet, (F) - Bar Reinforcing Steel, Reset Pedestrian Barricade, 18" Alternative Pipe Culvert, Concrete Backfill (Pipe Trench) (Rapid Strength Concrete), 15" Reinforced Concrete Pipe, 18" Reinforced Concrete Pipe, Drainage Inlet Marker, 10" Welded Steel Pipe (.134" Thick), Sidewalk Underdrain, 18" Steel Flared End Section, Remove Culvert (Lf), Remove Inlet, Remove Flared End Section (Ea), Adjust Inlet, Adjust Water Valve Cover To Grade, Modify Inlet, (F) - Small-Rock Slope Protection, Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Driveway), Minor Concrete (Textured Paving), Minor Concrete (Curb, Sidewalk And Curb Ramp), Remove Concrete Curb (Lf), Remove Concrete Sidewalk (Sqyd), Remove Concrete (Curb And Gutter), Remove Concrete Pavers (Sqft), Pre/Post Construction Surveys, (F) - Miscellaneous Iron And Steel, Lighting (City Street), Modifying Lighting Systems (City Street), Adjust Manhole Frame And Cover (Utility), Adjust Water Meter Box To Grade, Reset Bike Rack, Reset Planter Fence, Remove Pavement Marker, Delineator (Class 1), Pavement Marker (Retroreflective), Remove Roadside Sign, Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Roadside Sign Panel, Reset Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Roadside Sign Panel On Existing Post, (F) - Handrailing, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Green Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 6- 1), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 8- 4), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Maintaining Existing Traffic Management System Elements During Construction, Modifying Lighting Systems, Modifying Signal And Lighting Systems, Modifying Pedestrian Hybrid Beacon Systems, Mobilization
How We Support You: Argonaut Constructors is committed to promoting diversity and assisting DBE/WBE/MBE firms by offering the following support:
- Assistance with bid preparation and scope clarifications
- Help with bonding, insurance, and technical requirements
- Breaking work into smaller, manageable packages
For questions or additional details, contact:
Matt Howell ( (Estimator) Email: mhowell@argonautconstructors.com and estimating@argonautconstructors.com
Phone: (707) 542-4862
Requirements:
- Insurance with Argonaut as Additional Insured
- Payment & Performance Bonds may be required for contracts over $25,000
- Union participation required for non-signatory subcontractors
Equal Opportunity Employer
All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
Argonaut Constructors, Inc.
360 Sutton Place, Santa Rosa, CA 95407
Phone: (707) 542-4862
Fax: (707) 542-4897
Contact: Denise Whitfield, Bid Administrator
Email: dwhitfield@argonautconstructors.com |