Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

Certified DGS Trade and Focus Publication since 2002


 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: May 18th, 2018 @ 3:10 pm through bid opening date

 

WABO Landscape & Construction, Inc.

WABO Landscape & Construction, Inc. is seeking quotes from qualified subcontractors and service providers, particularly those who are Certified DVBE's for work on the following project:

Agency: Caltrans

Contract No.:04-0P6104

Project Name: Contra Costa County In San Ramon From 0.2 Mile South Of Bollinger Canyon Road Overcrossing To 0.3 Mile North Of Crow Canyon Road Overcrossing

Project Description: Upgrade Irrigation System for Conversion to Recycled Water

Bid Date: May 31, 2018 at 2:00 p.m.

DVBE Goal: 5 %


Work includes, but is not limited to the following bid items: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Storm Water Pollution Prevention Plan, Storm Water Annual Report, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Roadside Clearing, Prune Existing Plants, Maintain Existing Planted Areas, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Irrigation Facility, Salvage Irrigation Facility, Temporary Irrigation System, Control And Neutral Conductors (Armor-Clad), 1" Remote Control Valve, 1 1/2" Remote Control Valve, Remote Control Valve With Flow Sensor, 1" Wye Strainer Assembly, 1 1/2" Wye Strainer Assembly, 2" Wye Strainer Assembly, 3" Wye Strainer Assembly, 30-42 Station Irrigation Controller (Pedestal Mounted), Recycled Water Identification And Warning Signs, Flow Sensor Cable, Riser Sprinkler Assembly (Gear Driven), Pop-Up Sprinkler Assembly (Gear Driven), Cam Coupler Assembly, 2 1/2" Gate Valve, 3" Gate Valve, 3/4" Plastic Pipe (Schedule 40) (Supply Line), 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), 2 1/2" Plastic Pipe (Schedule 40) (Supply Line), 3" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Class 315) (Supply Line), 2 1/2" Plastic Pipe (Class 315) (Supply Line), 3" Plastic Pipe (Class 315) (Supply Line), Pressure Regulating Valve, Quick Coupling Valve, Ball Valve, Move-In/Move-Out (Erosion Control), Bonded Fiber Matrix (Sqft), Rolled Erosion Control Product (Blanket), Fiber Rolls, 4' Chain Link Gate (Type Cl-6), Maintaining Existing Traffic Management System Elements During Construction, Mobilization

WABO also requests quotes from vendors, particularly vendors who are Certified DVBEs and are either manufacturers or regular dealers as defined by 49 CFR 26.55, for all materials and supplies for this project. WABO will consider quotes for any work on this project including work we traditionally perform with our own forces to insure DVBE participation.

WABO will work cooperatively with all qualified firms interested in bidding this project. We are willing to break bid items down into economically feasible units where feasible. Contact us to do so, or if you have any questions related to this project or wish to discuss the plans, specifications or requirements of the contract.


Please contact us if you need help in obtaining bonding, insurance, lines of credit, equipment, materials, supplies or some other form of assistance in order to participate.
Subcontractors will be required to meet our insurance requirements and bonds may be required.

WABO is signatory with the Laborers, Operators and Plumbers Unions.
WABO Landscape & Construction, Inc. is an Equal Opportunity Employer.

Please fax quotes to (510)724-2391 or email to bids@wabo.com no later than 10 AM on bid day and be sure to include your contact information and state your status as a Certified DVBE if applicable.

 

Published on May 18th, 2018 @ 3:10 pm by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME