Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

Certified DGS Trade and Focus Publication since 2002


 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS
Advertisement date: May 18th, 2018 @ 3:18 p.m. through bid opening date

 

Strawn Construction, Inc is an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for referenced project:

Project Name: Menlo-Atherton High School Locker Room Remodel

Project Owner: Sequoia Union Union High School District

Project location: Atherton, CA

Bid Date: May 21, 2018 @ 2PM

Contract Number: RFP  No . 002

General work description: Remodel Menlo-Atherton High School Locker Room Area

Qualified subcontractors and suppliers including certified DVBE firms are asked to submit quotes for all bid items including but not limited to: CONCRETE, CAST-IN-PLACE CONCRETE, STRUCTURAL STEEL ,ROUGH CARPENTRY, FINISH CARPENTRY, THERMAL AND MOISTURE PROTECTION ,HOLLOW METAL DOORS AND FRAMES ,ALUMINUM DOOR AND WINDOW FRAMES,FIBERGLASS DOORS,ACCESS DOORS; OVERHEAD COILING GRILLES; DOOR HARDWARE; GLAZING SURFACE FILMS; MAINTENANCE AND REPAIR OF PLASTER; GYPSUM BOARD; TILING; RESILIENT FLOORING; ELASTOMERIC LIQUID FLOORING; PAINTING; CONCRETE FLOOR SEALING; SOLID COLOR REINFORCED COMPOSIT; OILET; COMPARTMENTS; COMMERCIAL TOILET ACCESSORIES; FIRE PROTECTION SPECIALTIES; METAL LOCKERS; COMMON WORK RESULTS FOR PLUMBING;PLUMBING PIPING AND VALVES;PIPING SPECIALTIES;PLUMBING FIXTURES;HEATING VENTILATING AND AIR CONDITIONING; COMMON WORK RESULTS FOR HVAC;MOTORS AND DRIVES;HANGERS SUPPORTS AND SEISMIC RESTAINT FOR HVAC PIPING AND EQUIPMENT; IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT;TESTING FOR HVAC;BALANCING FOR HVAC;HVAC INSULATION; ENERGY MANAGEMENT SYSTEM (CONTROLS);HVAC AIR DISTRIBUTION;CENTRIFUGAL HVAC FANS;AIR HANDLING UNIT; FIELD TEST AND OPERATIONAL TEST;COMMON WORK FOR ELECTRICAL;BASIC MATERIALS AND METHODS; HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS;ELECTRICAL SYSTEMS FIRESTOPPING;PANELBOARDS;LOW-VOLTAGE MOTOR CONTROLLERS;LIGHTING CONTROLS; LIGHT FIXTURES LAMPS AND BALLASTS;FIRE DETECTION AND ALARM SYSTEM

Plans and specifications are available for viewing at our office or https://www.dropbox.com/sh/tqv8s8ts689ep4c/AACGOGwN8Ql3d4f4GKzf7jmta?dl=0

For any bid proposal submitted after March 1, 2015 and any contract for public work entered into on or after April 1, 2015, the following registration requirements apply:  Every Subcontractor is required to be registered to perform public work pursuant to Section 1725.5 of the Public Contract Code (“Section 1725.5”).  No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal pursuant to Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered to perform public work pursuant to Section 1725.5.  No bid shall be accepted nor any subcontract entered into without proof of the Subcontractor’s current registration to perform public work pursuant to Section 1725 .5.

Subcontractors must possess a current contractor’s license, insurance and worker’s compensation. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Strawn Construction intends to work cooperatively with all qualified firms seeking work on this project. 


  Portions of work can be made available upon request prior to bid date. Please call if any assistance is needed.

Strawn Conctruction

Office: 408-906-8575
Cell: 408-833-3059
Fax: 408-286-1288
E-mail: vvillegas@scmdinc.com

Strawn Construction, Inc is an Equal Opportunity Employer.  

Published onMay 18th, 2018 @ 3:18 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME