www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date May 11, 2022 @ 2:45 p.m. through bid opening date

License No. 626859
5400 Hanna Ranch Road Novato, CA 94945
Phone: 415.456.8972 Fax: 415.459.0665

ALL POTENTIAL SUBCONTRACTORS
*********************************************************************************
     THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE subcontractors, suppliers & truckers for the following project: 

Agency: Caltrans No. 04-4H0504
Construction on State Highway in Sonoma County Near Santa Rosa at Sonoma Creek Bridge and At Hooker Creek Bridge
Estimated Bid Value $8,800,000
Bids open Thursday, May 19, 2022, at 2:00 PM
* 25% DBE Requirement *

General work description:  CIDH piles, excavation, rock slope protection, and bridge removal.

Plans and specifications may be emailed upon request or downloaded from the following link: https://tpcorp.box.com/s/daonrybjygnq0crwdf2j2zrv489gvdrd
        
Seeking ALL subcontractors/suppliers/truckers for this project, especially DBE subcontractors, suppliers & truckers, TRADES NEEDED (but not limited to):Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Temporary Pavement Marking (Paint), Channelizer (Surface Mounted), Temporary Barrier System, Portable Changeable Message Sign (Ea), Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Rain Event Action Plan, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Reinforced Silt Fence, Temporary Silt Fence, Temporary Construction Entrance, Temporary Construction Roadway, Street Sweeping, Temporary Active Treatment System, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Remove Yellow Painted Traffic Stripe (Hazardous Waste), Treated Wood Waste, Log Spur With Rootwad Revetment, Engineered Streambed Material, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Roadway Excavation (Topsoil), Channel Excavation, Roadway Excavation (Type Com) (Aerially Deposited Lead), Shoulder Backing, (F) - Structure Excavation (Type D), (F) - Structure Excavation (Retaining Wall), (F) - Structure Backfill (Bridge), (F) - Structure Backfill (Retaining Wall), Ditch Excavation, Subgrade Enhancement Geotextile, Class A1, Roadside Clearing, Soil Amendment, Organic Fertilizer, Plant (Group H), Plant (Group I), Plant (Group A), Plant Establishment Work, Wood Mulch, Foliage Protector, 2" Wye Strainer Assembly, (F) - 1 1/2" Galvanized Steel Pipe (Supply Line), (F) - 2" Galvanized Steel Pipe (Supply Line), Riser Sprinkler Assembly, Cam Coupler Assembly,  Plastic Pipe, Air/Vacuum Relief Valve, Ball Valve, Move-In/Move-Out (Erosion Control), Rolled Erosion Control Product (Netting), Rolled Erosion Control Product (Blanket), Hydromulch, Fiber Rolls, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Subbase, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Cold Plane Asphalt Concrete Pavement, 24" Cast-In-Drilled-Hole Concrete Piling, Prestressing (Transverse Tie Rods), (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Retaining Wall, (F) - Structural Concrete, Drainage Inlet, (F) - Furnish Precast Prestressed Concrete Slab (Type Siii), (F) - Furnish Precast Prestressed Concrete Slab (Modified), (F) - Furnish Precast Prestresed Concrete Slab (Type Siii Modified), Erect Precast Prestressed Concrete Deck Unit, Joint Seal (Mr 1"), (F) - Bar Reinforcing Steel (Bridge), (F) - Bar Reinforcing Steel (Retaining Wall), (F) - Preformed Membrane Waterproofing, Public Safety Plan, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, (F) - Place Polyester Concrete Overlay, Bridge Removal, Location A, Bridge Removal, Location B, 18" Alternative Pipe Culvert, Bioretention, 12" Corrugated Steel Pipe Downdrain, Downdrain Energy Dissipator, Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), (F) - Miscellaneous Iron And Steel, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Object Marker (Type P), Object Marker (Type R), Remove Roadside Sign (Wood Post), Remove Roadside Sign Panel, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminun Sign (0.063"-Unframed) For Retroreflective, Sheeting , Furnish Single Sheet Aluminum Sign (0.080"-Unframed) For Retroreflective Sheeting (Type Xi), Retroreflective Sheeting (Type Xi), Roadside Sign - One Post, Install Roadside Sign Panel On Existing Post, Midwest Guardrail System (Wood Post), Vegetation Control (Minor Concrete), - Metal Railing, (F) - Cable Railing, Transition Railing (Type Wb-31), End Cap (Type A), End Cap (Type Tc), End Anchor Assembly (Type Sft), Alternative In-Line Terminal System, Alternative Crash Cushion System, Concrete Barrier , Remove Guardrail, Thermoplastic Traffic Stripe , Paint Traffic Stripe (1-Coat), Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe, 6" Rumble Strip (Asphalt Concrete Pavement), 12" Rumble Strip (Asphalt Concrete Pavement), Mobilization. and any other relevant area of work associated with this project.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. 

Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through  Friday  from 7:30 AM to 4:00 PM. 

Thompson Builders Corporation is an Equal Opportunity Employer
 Contact:  Shannon Miller
PHONE: (415) 456-8972     FAX: (415) 459-0665

EMAIL:  bids@tbcorp.com

Published on May 11, 2022 @ 2:45 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME