www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date May 7, 2021 @ 4:00 p.m. through bid opening date

 

Caliba Inc. is seeking qualified subcontractors, suppliers and DVBE for the OCN 04207 Admin Building Renovation Bid.

Bid Date & Time:

May 18, 2021 at 2:00 PM

Project Owner:

MiraCosta Community College District

Wage Determination

Prevailing Wage

Contact:

Rabih El Zein

Email Address:

bidding@calibainc.com

Estimator's Phone:

(714) 886-2887

Estimator’s Fax:

(714) 503-6805

Plans and Specs Link:

https://drive.google.com/drive/folders/1flasHdH‐4bYiSNEdvwcLns5F_zuibrMK?usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Caliba Inc. an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DVBE firms performing commercially useful function for the following items of work, including but not limited to: Selective Demolition, Concrete, Cast In Place Concrete, Concrete Floor Finishes, , Metals, Structural Steel, Cold Formed Metal Framing, Metal Fabrications, Pipe And Tube Railings, Woods, Plastics, And Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework, Wood Paneling, Thermal And Moisture Protection, Thermal Insulation, Weather Barriers, Under slab Vapor Barriers, Modified Bituminous Membrane Roofing, Sheet Metal Flashing, Joint Sealants, Door Hardware, Hollow Metal Doors And Frames (90 Frames & 81), Flush Wood Doors (59Ea), Access Doors And Panels, Aluminum Framed Store Fronts (11Ea Leafs), Glazed Aluminum Curtain Walls, Door Hardware (Non‐ Electric Hardware, Hinges Closures Etc.), Glazing, Louvers, Interior Finishes, Gyp Board Assemblies, Plastering (Lath), Tiling, Acoustical Ceilings, Resilient Flooring, Sheet Carpeting, Wall Coverings, Interior Surfacing Arch Film, Sound‐ Absorbing Wall And Ceiling Units, Exterior Painting, Interior Painting, Specialties, Gyp Board Assemblies, Plastering (Lath), Visual Display Boards, Signage, Plastic Toilet Compartments, Folding Panel Partitions, Toilet Accessories, Fire Protection Specialties, Equipment, Projection Screens (6Ea), Furnishings, Window Shades, Countertops, Entrance Floor Mats And Frames, Fire Suppression, Wet Pipe Sprinkler System, Plumbing, Interior Plumbing (Fixtures, Devices And Appurtenances), Hvac, Hvac (Duct, Equipment, Boilers, Vfd'S And Devices), Hydronic Piping , Hydronic Insulation,Integrated Automation & Controls, Low Voltage Controls, Software And Integration, Electrical, Electrical , Communications , Structured Cabling , Integrated Audio‐Video System, Electric Safety & Security , Security, Access Control & Intrusion Detection , Door Locking Hardware, Digital Addressable Fire Alarm System, Fire Detection And Alarm (Not Included ‐ Pending), Earthwork, Clear And Grub, Grading, Excavation, Exterior Improvements, Aggregate Base Courses, Asphalt Paving, Site Concrete, Parking Bumpers, Striping, Tactile Warning Surfacing, Irrigation Systems, Planting, Utilities, Site Water Piping, Site Sanitary Water Piping, Site Sanitary Sewer Piping, Storm Water Gravity Piping.

Scope of Services: This Project includes the following scope of work:(1) partial renovation of interiors of the existing one‐story building of approximately 18,857 GSF, including reconfiguration of interior partitions, finishes, furniture, fixture and equipment; (2) building envelope and roof upgrades; (3) accessibility upgrades for restrooms; (4) modifications to existing landscape and hardscape areas surrounding the existing structure; and (5) minor parking modifications to meet accessibility requirements.

Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.


Caliba Inc.
8031 Main Street, Stanton, CA 90680

Published on May 7, 2021 @ 4:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME