
Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans No. 05-1H4404
Project: Construction on State Highway In Santa Barbara And San Luis Obispo Counties In And Near Guadalupe At Santa Maria River Bridge
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=05-1H4404
DBE Goal: 20%
Bid Date: Thursday, June 19, 2025 at 2:00 PM
We would like to Receive Subcontractor ASAP, and no later than 12:00PM on the Day of Bid.
Engineers Estimate: $57,000,000
General work description: Santa Maria River Bridge (Replace).
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Automated Flagger Assistance Device Day, Job Site Management, Stormwater Pollution Prevention Plan, Stormwater Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Asbestos Compliance Plan, Treated Wood Waste, Bat And Bird Exclusion Devices, Temporary Wildlife Exclusion Fence, Remove Bollard, Temporary Boundary Sign (On Post), Clearing And Grubbing (Ls), Roadway Excavation, (F) - Structure Excavation (Bridge), (F) - Structure Backfill (Bridge), Imported Borrow (Cy), Roadside Clearing, Decorative Boulders, Rock Blanket, Soil Amendment, Organic Fertilizer, Plant (Group H), Plant (Group A), Plant Establishment Work, Gravel Mulch, Decomposed Granite, Wood Mulch, Edging, Temporary Irrigation System, Move-In/Move-Out (Erosion Control), Compost Sock, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Data Core, Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Temporary Shoring, Furnish 48" Steel Pipe Piling, Drive 48" Steel Pipe Pile, Furnish 36" Cast-In-Steel Shell Concrete Piling, Drive 36" Cast-In-Steel Shell Concrete Pile, Furnish Cast-In-Steel-Shell Concrete Piling (Nps 60), Drive Cast-In-Steel-Shell Concrete Pile (Nps 60), (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Drainage Inlet, Concrete Surface Texture (Fractured Rib), Furnish Precast Prestressed Concrete Wide Flange Girder (110'-120'), Erect Precast Prestressed Concrete Girder, Joint Seal (Mr 1"), Joint Seal (Mr 1 1/2"), Joint Seal (Mr 2"), (F) - Bar Reinforcing Steel (Bridge), Bridge Removal (Portion), 12" Alternative Pipe Culvert, 24" Alternative Pipe Culvert, 24" Reinforced Concrete Pipe, Entrance Taper, Drainage Inlet Marker, 24" Concrete Flared End Section, 12" Alternative Flared End Section, 24" Alternative Flared End Section, 36" Precast Concrete Pipe Inlet, Remove Pipe (Lf), Remove Downdrain (Ea), Remove Inlet, Rock Slope Protection (1/4 T, Class V, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Curb, Gutter, Sidewalk And Driveway), Minor Concrete (Rock Salt Textured Concrete), Minor Concrete (Seeded Aggregate Concrete), Minor Concrete (Curb Ramp), (F) - Miscellaneous Iron And Steel, Miscellaneous Metal (Hangers), 2" Schedule 40 Hdpe Conduit, 3" Schedule 40 Hdpe Conduit, 4" Schedule 80 Hdpe Conduit, 4" Schedule 40 Pvc Conduit, 6" Schedule 40 Pvc Conduit, 4" Schedule 40 Rigid Conduit, 6" Schedule 40 Rigid Conduit, Vault Installation, Pull Box Installation, Manhole Installation, Utility Trench, Slurry Cement Backfill (Utility), Relocate Fire Hydrant, Adjust Fire Hydrant To Grade, Adjust Monument Cover To Grade, Adjust Manhole Frame And Cover (Utility), Lower And Raise Frame And Cover (Utility), Prepare And Stain Concrete, (F) - Anti-Graffiti Coating, Bat House (Precast Concrete), Bat House (Premanufactured), Bat House (Wood), Fence (Type Bw, 4-Strand, Metal Post), Remove Fence, Remove Pavement Marker, Delineator (Class 1), Guard Railing Delineator, Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Object Marker (Type L-1), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Midwest Guardrail System (Steel Post), Vegetation Control (Crushed Shale), (F) - Tubular Handrailing, (F) - Tubular Bicycle Railing, Transition Railing (Type Agt), Alternative In-Line Terminal Tl-3, (F) - Concrete Barrier (Pedestrian), (F) - Concrete Barrier (Type 836 Modified), (F) - Concrete Barrier Transition, Remove Guardrail, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, 6" Traffic Stripe Tape With Contrast, Conduit System, Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |