Advertisement date May 5, 2025 @ 10:10 a.m. through bid opening date

License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Riverside Construction Company, Inc. an Equal Opportunity Employer Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers performing commercially useful functions for the following project:
Agency: Caltrans No. 12-0S5304
Project: Construction on State Highway In Orange County In Anaheim At Southbound Route 57 Off-ramp To Westbound Route 91
DBE Goal: 22%
Engineers Estimate: $4,370,000
Bids open Wednesday, June 4, 2025, at 2:00 PM

General work description: Place JPCP (RSC) and HMA, modify ramp and electrical systems.

Bid docs available on our website at https://bids.rivconstruct.com/
or https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=12-0S5304

Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:  Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Channelizer (Surface Mounted), Portable Flashing Beacons (Ea), Temporary Barrier System, Portable Changeable Message Sign (Ea), Temporary Crash Cushion Tl-3, Temporary Traffic Screen, Job Site Management, Water Pollution Control Program, Temporary Drainage Inlet Protection, Treated Wood Waste, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type R-1) (Aerially Deposited Lead), (F) - Structure Excavation (Ground Anchor Wall), (F) - Structure Backfill (Ground Anchor Wall), Ditch Excavation, Rock Blanket, Class 2 Aggregate Subbase, Class 2 Aggregate Base (Cy), Lean Concrete Base Rapid Setting, Base Bond Breaker, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Remove Asphalt Concrete Dike, Remove Base And Surfacing, Jointed Plain Concrete Pavement (Rsc), Joint Seal (Asphalt Rubber), Ground Anchor (Subhorizontal), (F) - Structural Concrete, Wall Facing, (F) - Structural Concrete, Headwall, (F) - Structural Concrete, Drainage Inlet, (F) - Minor Concrete (Minor Structure), Concrete Surface Texture (Fractured Rib), (F) - Bar Reinforcing Steel (Ground Anchor Wall), (F) - Structural Shotcrete, 18" Alternative Slotted Pipe, 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, Remove Inlet, Remove Headwall, Remove Concrete (Channel), Remove Slope Paving (Sqyd), Concrete (Ditch Lining), Slope Paving (Concrete), Minor Concrete (Gutter) (Lf), (F) - Miscellaneous Iron And Steel, Remove Pavement Marker, Delineator (Class 1), Guard Railing Delineator, Pavement Marker (Retroreflective), Object Marker (Type P), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Midwest Guardrail System (Wood Post), (F) - Cable Railing, End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Severe-Duty Crash Cushion Tl-3, Concrete Barrier (Type 60M), Concrete Barrier (Type 60Md), Concrete Barrier (Type 60Ms), (F) - Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Concrete Pavement), Contrast Stripe Paint (2-Coat), Modifying Fiber Optic Cable Systems, Temporary Fiber Optic Cable Systems, Modifying Lighting Systems, Modifying Traffic Monitoring Stations, Mobilization

Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.

Riverside Construction Company, Inc.
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 