www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date May 1, 2023 @ 3:50 p.m. through bid opening date

*REQUEST FOR DBE SUBCONTRACTORS, SUPPLIERS & SERVICES*

CALTRANS CONTRACT #: 02-1H58U4    BID DATE: 5/18/23 @ 2:00PM

LOCATION: PLUMAS COUNTY AT & NEAR CROMBERG

GENERAL DESCRIPTION: RECONSTRUCT ROADWAY, HMA PAVING, DRAINAGE & ELECTRICAL WORK

PHONE: (707) 443-6371  FAX: (707) 443-0277

ESTIMATOR: Mark Benzinger & Kody King   Please send quotes to: ccoppini@mercerfraser.com

**Addendum 1 issued 4/07/2023**
**Addendum 2 issued 4/25/2023**
**Addendum 3 issued 5/15/2023**

https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=02-1H58U4

Mercer-Fraser Company is seeking quotes for the following items of work: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, UPRR PREQUALIFIED FLAGGING, TRAFFIC CONTROL SUPERVISOR, TYPE III BARRICADE, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP BARRIER SYSTEM, RELOCATE TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMP CRASH CUSHION, RELOCATE ALTERNATIVE TEMP CRASH CUSHION, JOB SITE MANAGEMENT, PREP SWPPP, RAIN EVENT ACTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, REPORTING), TEMP CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, BIRD EXCLUSION DEVICES, INVASIVE SPECIES CONTROL, REMOVE CONCRETE, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, DUST PALLIATIVE, ROADWAY EXCAVATION, ROCK EXCAVATION, SHOULDER BACKING, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, SUBGRADE ENHANCEMENT GEOTEXTILE, ROADSIDE CLEARING, SOIL TESTING, PLANT (GROUP H), HYDRAULIC BIOTIC GROWTH MEDIUM, BONDED FIBER MATRIX, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, INCORPORATE MATERIALS, FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, FULL DEPTH RECYCLING-CEMENT, SUPPLEMENTARY AGGREGATE (FULL DEPTH RECYCLING-CEMENT), ASPHALTIC EMULSION (FULL DEPTH RECYCLING-CEMENT), SAND COVER (FULL DEPTH RECYCLING-CEMENT), MIX DESIGN (FULL DEPTH RECYCLING-CEMENT), HOT MIX ASPHALT, DATA CORE, PLACE HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE AC PAVEMENT, COLD PLANE AC PAVEMENT, RAIL ELEMENT WALL, TRACTION-SAND TRAP, STRUCTURAL CONCRETE, DRILL & BOND DOWEL, BAR REINFORCING STEEL, PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE, REMOVE UNSOUND CONCRETE, REMOVE POLYESTER CONCRETE OVERLAY, PREP CONCRETE BRIDGE DECK SURFACE, FURNISH & PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL, ALTERNATIVE PIPE CULVERT, CONCRETE BACKFILL, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE ELLIPTICAL, CORRUGATED STEEL PIPE, CORRUGATED STEEL PIPE ARCH, STRUCTURAL STEEL PLATE PIPE, PERFORATED PLASTIC PIPE UNDERDRAIN, CORRUGATED STEEL PIPE DOWNDRAIN, ENTRANCE TAPER, DOWNDRAIN SLIP JOINT, ANCHOR ASSEMBLY, CABLE ANCHORAGE SYSTEM, ANCHOR ASSEMBLY, CABLE ANCHORAGE SYSTEM, WELDED STEEL PIPE TRENCHLESS INSTALLATION METHOD, WELDED STEEL PIPE, STEEL FLARED END SECTION, CONCRETE FLARED END SECTION, PRECAST CONCRETE PIPE INLET, ABANDON CULVERT, ABANDON REINFORCED CONCRETE BOX, REMOVE OVERSIDE DRAIN, REMOVE CULVERT, REMOVE DOWNDRAIN, REMOVE REINFORCED CONCRETE BOX CULVERT, REMOVE INLET, REMOVE HEADWALL & WINGWALL, REMOVE EDGE DRAIN, REMOVE ASPHALT CONCRETE OVERSIDE DRAIN, REMOVE FLARED END SECTION, RESET INLET, MODIFY HEADWALL, MODIFY INLET, (CLEAN, INSPECT, PREP) CULVERT, SAND BACKFILL, CURED-IN-PLACE PIPELINER, STREAMBED MATERIAL, REMOVE ROCK SLOPE PROTECTION, GABION, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, DETECTABLE WARNING SURFACE, MINOR CONCRETE, MASONRY BLOCK WALL, REMOVE WALL (MASONRY BLOCK), MISC IRON & STEEL, RECONSTRUCT ROADSIDE ROCKFALL FENCE, SALVAGE ROADSIDE ROCKFALL FENCE, ADJUST UTILITY COVER TO GRADE, ADJUST MANHOLE FRAME & COVER, REMOVE LIGHT STANDARD, PREP & STAIN CONCRETE, RECONSTRUCT & RECONTRUCT FENCE, CONSTRUCT CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, DELINEATOR, PAVEMENT MARKER, MILEPOST MARKER, MARKER (CULVERT), TREATMENT BEST MANAGEMENT PRACTICE MARKER, OBJECT MARKER, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, CABLE RAILING, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER, SALVAGE GUARDRAIL, THERMOPLASTIC CROSSWALK PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE, RUMBLE STRIP, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC CROSSWALK & PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) (RECESSED), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TEMP SIGNAL SYSTEMS, MODIFYING SIGNAL & LIGHTING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, UNREINFORCED GEOMEMBRANE, GEOMEMBRANE, CUSHION FABRIC, RELOCATE WATER LINE

GENERAL REQUIREMENTS: Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request at info@mercerfraser.com, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office at (707) 443-6371.

Published on May 1, 2023 @ 3:50 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME