www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date April 29, 2024 @ 12:05 p.m. through bid opening date

Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: Caltrans No. 07-333604
Project: Construction on State Highway In Los Angeles County In Los Angeles At Various Locations From Centinela Avenue To Glendale Boulevard Undercrossing
Bid Date: May 23, 2024, at 2:00 PM
DBE Goal: 21%
Engineers Estimate: $44,000,000.

Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/p66m7y5maszbtwoi59fdi/ADSrtQW2zxnzuxSqu4FxZ_8?rlkey=msgz2v8q3i929ugeak7n2ji93&st=trimlkc7&dl=0

General work description: Cold plane AC, place HMA, replace curb ramps, and traffic signals.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Flashing Arrow Sign, Type Ii Barricade, Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pedestrian Access Route, Job Site Management, Stormwater Pollution Prevention Plan, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Remove Yellow Thermoplastic Pavement Marking (Hazardous Waste), Treated Wood Waste, Noise Monitoring, Remove Concrete (Cy), Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Roadside Clearing, Prune Existing Plants, Rock Blanket, Soil Amendment, Packet Fertilizer, Plant (Group A), Plant Establishment Work, Gravel Mulch, Root Barrier, Temporary Irrigation System, Imported Topsoil (Cy), Finishing Roadway, Class 3 Aggregate Base (Cy), Lean Concrete Base, Lean Concrete Base Rapid Setting, Base Bond Breaker, Segment Correction, Replace Asphalt Concrete Surfacing, Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Remove Asphalt Concrete Pavement (Sqft), Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), (F) - Minor Concrete (Minor Structure), Repair Spalled Surface Area, Reconstruct Drainage Facility (Ea), Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Gutter Depression), Minor Concrete (Rsc) For Driveway And Cross Gutters, Minor Concrete (Stamped Concrete), Salvage Metal Capped Curb, Pre/Post Construction Surveys, Pedestrian Handrailing, County Of Los Angeles Drainage Facilities, Adjust Inlet (City), Modifying Lighting Systems (City), Flashing Beacon System (City), Pedestrian Hybrid Beacon System (City), Interconnection Conduit And Cable (City), Modifying Signal And Lighting Systems (City Street), Remove And Replace Monument, Paint Curb (2-Coat), Prepare And Stain Concrete, Reset Newspaper Box, Relocate Mailbox, Reset Bike Rack, Remove Bike Rack, Install Bike Rack, Relocate Bike Rack, Remove Chain Link Fence, Reconstruct Chain Link Fence, Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Roadside Sign Mounted On Mast Arm, Remove Roadside Sign (Wood Post), Remove Roadside Sign (Metal Post), Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Roadside Sign Panel, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Metal (Roadside Sign), Metal (Barrier Mounted Sign), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Sign (Mast-Arm Hanger Method), Install Sign Panel On Soundwall, (F) - Chain Link Railing, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Preformed Thermoplastic Pavement Marking, Painted Stall Lines And Pavement Markings, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Methyl Methacrylate Paint Traffic Stripe Crosswalk And Pavement Marking, 6" Traffic Stripe Tape (Warranty) (Broken 18-12), 6" Traffic Stripe Tape (Warranty) (Broken 17-7), Mobilization, Trucking, Equipment Rental

Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer.

Griffith Company
CA Contractors License #88
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone: 562-929-1128 Fax: 562-864-8970

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME