WABO Landscape & Construction, Inc
Contractor's License No. 962263 A, B & C27
WABO Landscaping & Construction, Inc is seeking quotes from qualified subcontractors and service providers, particularly those who are Certified DBE's for work on the following project:
Agency: CalTrans
District 3, City & County of Sacramento
Contract # 03-2H1304 / Federal Aid Project # ACIM-0056(359)E
Project Description: Highway planting, decomposed granite & building electrical work
Bid Date: May 11, 2022 at 02:00 PM
New Bid Date: May 25, 2022 at 02:00 PM
DBE Goal: 25%
Addendum 1 issued 5/9/2022
To view addendum please visit: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/addendum.php?id=03-2H1304
Work is approx. 150-210 Working Days(Cost Plus Time) & 750 Additional Working Days Plant Establishment
WABO Landscape & Construction, Inc. is seeking certified and qualified DBE subs and/or suppliers to provide quotes for the following bid items: Lead Compliance Plan, Time-Related Overhead (Ls), Traffic Control System, Portable Changeable Message Sign (Ls), Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Concrete Washout, Contractor-Supplied Biologist (Ls), Roadside Clearing, Rock Mulch, Soil Amendment, Packet Fertilizer, Plant (Group A), Plant (Group U), Maintain Existing Planted Areas, Plant Establishment Work, Decomposed Granite, Wood Mulch, Edging, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, 1" Remote Control Valve, 1- 1/2" Remote Control Valve, 2" Wye Strainer Assembly, 24-32 Station Irrigation Controller (Pedestal Mounted), 2" Backflow Preventer Assembly, Backflow Preventer Enclosure, Flow Sensor, Riser Sprinkler Assembly, 2" Gate Valve, 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Schedule 40) (Supply Line), Ball Valve, Slope Paving (Concrete), Temporary Fence, Tube Steel Fence, Locating And Mapping Underground Facilities, Modifying Electrical Service For Booster Pump, Building Work, Water Meter Charges, Mobilization
WABO also requests quotes from vendors, particularly vendors who are Certified DBEs and are either manufacturers or regular dealers as defined by 49 CFR 26.55, for all materials and supplies for this project. Required materials include, but are not limited to: Boulder, Decomposed Granite, Soil Amendment, Packet Fertilizer, Temp. Fiber Roll, Plants, Wood Mulch, Rock Mulch, Compost, Wire, Irrigation System (pipe, valves, strainers, bubblers, sprinklers, flow sensor, joints, elbows, connectors, controllers), Tube Steel Fence, Portable Changeable Message Signs and other construction materials.
WABO will consider quotes for any work on this project including work we traditionally perform with our own forces to ensure DBE participation.
WABO will work cooperatively with all qualified firms interested in bidding this project. We are willing to break bid items down into economically feasible units where feasible. Contact us to do so, or if you have any questions related to this project or wish to discuss the plans, specifications or requirements of the contract. Please contact us if you need help in obtaining bonding, insurance, lines of credit, equipment, materials, supplies or some other form of assistance in order to participate.
Subcontractors will be required to meet our insurance requirements and bonds may be required. WABO is signatory with the Laborers, Operators and Plumbers Unions.
This is a Federally Funded Project -- wages in your bid should be planned accordingly
WABO Landscape & Construction, Inc. is an Equal Opportunity Employer
Please fax quotes to
(510)724-2391 or email to bids@wabo.com no later than 10 AM on bid day and be sure to include your contact information and state your status as a Certified DBE if applicable. |