Papich Construction Company Is seeking DBE Sub-contractors and Material suppliers quotes for the following project:
Agency: City of Fresno - 24-02-C
Project: JENSEN AVENUE IMPROVEMENTS WEST AVENUE TO FIG AVENUE (MLK BOULEVARD)
Bids open Thursday, May 1, 2025 @ 5:00 PM
DBE Goal: 17%
Engineer’s Estimate Range: $5,850,000 - $6,500,000
General work description: The work to be done consists, in general, of reconstructing approximately 1.5 miles of Jensen Avenue from West Avenue to Fig Avenue (also known as MLK Blvd). The road will be reconstructed using a Full-Depth Reclamation with Cement method. The road work includes construction of new curb ramps, adjusting sewer manholes, signage and striping, and other miscellaneous items. A new ductile iron water pipeline will also be installed, replacing an existing asbestos water pipeline to be abandoned in place. Coordination with City of Fresno Public Utilities Department will be necessary to arrange the tie-in to existing system. The pipe replacement also involves installation of new water meters, fire hydrants, valves, and other appurtenant work. Some Fresno Metropolitan Flood Control District (FMFCD) master storm drain facilities shall also be installed as part of the work
Estimating Dept.
Email: estimating@papichconstruction.com
Plans and Specs: https://www.fresnocountyca.gov/Departments/Public-Works-and-Planning/Construction-Bidding-Opportunities/24-02-C-Jensen-Avenue-Improvements
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Supplemental Work (Payment Adjustments For Price Index, Fluctuations), 9, Construction Project Information Sign 12, Traffic Control System (Road Reconstruction) 12, Prepare And Implement Storm Water Pollution Prevention, Plan, 13, Storm Water Annual Report 13, State Water Resources Control Board Notice Of Intent, Filing Fee, 13, Job Site Management 14, Dust Control Plan 14, Lead Compliance Plan 14, Demo Existing Concrete (Ramp, Sidewalk, C&G & Vault) 15, Remove And Dispose Sign 15, Temporary Mailbox 15, Clearing And Grubbing 17, Roadway Excavation 19, Shoulder Backing 19, Finishing Roadway 22, Pulverized Material & Material Handling (Sta 72+43 To Sta 83) 30, 1-Foot Full Depth Reclamation With Cement (Fdr-C) (F) 30, 1.25-Foot Full Depth Reclamation With Cement (Fdr-C) (F) 30, Increase Or Decrease In Cement For Fdr-C Method 30, Hot Mix Asphalt (Type A 3/4" Grading) 39, Minor Hot Mix Asphalt 39, Place Minor Hma Miscellaneous Areas 39, Place Ac Dike Type E (Minor Hma) 39, Place Ac Dike Type A (Minor Hma) 39, Tack Coat 39, 18 Inch Rubber Gasket Reinfocred Concrete Pipe Class Iii 65, 18 Inch Rubber Gasket Reinfocred Concrete Pipe Class Iv 65, 18 Inch Rubber Gasket Reinfocred Concrete Pipe Class V Or, Class Iv W/ Special Bedding, 65, 36 Inch Rubber Gasket Reinfocred Concrete Pipe Class Iii 65, 36 Inch Rubber Gasket Reinfocred Concrete Pipe Class Iv 65, 36 Inch Rubber Gasket Reinfocred Concrete Pipe Class V 65, Temporary Trench Resurfacing – Storm Drain System 65, Type A Case I Manhole 70, Type A Case Ii Manhole 70, Minor Concrete (Curb Ramp) 73, Install Curb And Gutter 73, Detectable Warning Surface 73, Adjust Water Valve Lid To Grade 77, Adjust Manhole Lid To Grade 77, Adjust Pull Box Lid To Grade, Survey Monument 78, Install New Channelizer, Roadside Sign - One Post 82, Thermoplastic Traffic Stripe (Detail 8) 84, Thermoplastic Traffic Stripe (Detail 22) 84, Thermoplastic Traffic Stripe (Detail 29) 84, Thermoplastic Traffic Stripe (Detail 38) 84, Thermoplastic Traffic Stripe (Detail 38A) 84, Thermoplastic Traffic Stripe (Detail 39) 84, Thermoplastic Traffic Stripe (Detail 39A) 84, Thermoplastic Diagonal And Chevron Traffic Stripe (6", White), 84, Thermoplastic Traffic Stripe (12" White) - Limit Line 84, Thermoplastic Traffic Stripe (12" Yellow) - Crosswalk 84, Thermoplastic Pavement Markings 84, Thermoplastic Traffic Stripe (Detail 26) 84, Thermoplastic Traffic Stripe (Detail 27B) 84, Thermoplastic Diagonal Yellow Stripe 8'' Wide 84, Blue Fire Hydrant Marker 84, Retroreflective Pavement Marker (Type D) 84, Retroreflective Pavement Marker (Type G And H) 84, Paint Pavement Markings (Bike Symbol And Arrows) 84, Paint Ac Dike White 84, Green Traffic Paint Mma 84, Remove Yellowline Traffic Stripe Containing Lead, Mobilization (Water Infrastructure Replacement) 77, Mediator (Owner'S 50% Share, Pg. 2.53 Of General Conditions) 77, Traffic Control, Detours And Access (Water Infrastructure Replacement) 77, Dust Control Plan (Water Infrastructure Replacement) 77, Prepare And Implement Storm Water Pollution Prevention, Plan (Water Infrastructure Replacement), 77, Worker Protection From The Hazard Of Caving Ground 77, Trench Protection 77, Temporary Trench Resurfacing (Water Infrastructure) 77, Furnish And Install 1-Inch Water Service And Meter Box 77, Furnish And Install 1.5-Inch Water Service And Meter Box, Furnish And Install 2-Inch Water Service And Meter Box 77, Connect Water Service At Meter Box 77, Connect Water Service To Existing Lead Line (Front) 77, Furnish And Install Grounding Rod 77, Furnish And Install 1.5-Inch Sch 40 Pvc On-Site Lead Line 77, Furnish And Install 2-Inch Sch 40 Pvc On-Site Lead Line 77, Furnish And Install 8-Inch Cl 350 Ductile Iron Water Main 77, Furnish And Install 16-Inch Cl 350 Ductile Iron Water Main 77, Furnish And Install 8-Inch Gate Valve 77, Furnish And Install 16-Inch Butterfly Valve See Plans and Specs for complete list.
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |