www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date April 11, 2024 @ 2:15 p.m. through bid opening date

Angotti & Reilly, Inc. invites your firm to BID the following Marin County Parks project, per the specification, drawings.  We encourage all DBE, DVBE, LBE, MBE, SBE, WBE firms to submit BID proposals. 


Project: Hal Brown Bridge and Pathway
Project No. 2024-01
Owner:MARIN COUNTY PARKS
BID DATE: April 17, 2024 @ 2:00 PM
***NEW BID DATE: Friday, April 19, 2024 at 9AM***

In order to allow ample time to review your proposal, please ensure your BID proposal is received no later than APRIL 18, 2024.  Send BID proposal and any questions to the attention of James Reilly estimating@angotti-reilly.com

The Project is described as: The project is located in Creekside Marsh, a restored wetland between Bon Air Road and the Corte Madera Creek multi-use pathway. The scope of the project includes removing 2,300 square feet of existing asphalt pathway and an existing wood-framed bridge and foundations; and the installation of a new prefabricated bridge, an elevated wooden boardwalk, and new sections of asphalt pathways. The new bridge, boardwalk and pathway will be 10-feet wide and shall be compliant with all ADA accessibility requirements. The existing asphalt pathway will be removed, backfilled with native soils, and regraded to match existing adjacent grades. Construction of the new raised pathway includes the use of asphalt pavement, aggregate base, and lightweight backfill material. The purpose of the lightweight backfill is to reduce settlement in the underlying bay mud. The new prefabricated bridge will span 120 feet between new concrete abutments. The new wooden boardwalk will be approximately 47 feet in length and span between new concrete abutments. Helical piers will be utilized to support the concrete abutments and wooden boardwalk. The new sections of asphalt pathways will be installed at both ends of the project, adjacent to the new prefabricated bridge and adjacent to the new wooden boardwalk. Construction of bridge abutments, boardwalk, and raised pathway will be outside the limits of wetlands

TRADES REQUESTED:  DEMO | ASPHALT | CONCRETE FORMWORK, CAST-IN-PLACE | LANDSCAPING | CARPENTRY | EARTHWORK | FENCING | EXCAVATION | DE-WATERING | PAVING | HELICAL FOUNDATION ANCHORS | HANDRAIL | UTILITIES | DRAINAGE | STRUCTURAL STEEL | PREFABRICATED BRIDGE

If you are unable to review the Specifications, Drawings or Addendum, please contact us at estimating@angotti-reilly.com   Thank you and we look forward to your BID proposal.

ANGOTTI & REILLY, INC.
2200 Jerrold Ave, Suite E
SF CA, 94124
415.575.3700 OFFICE
415.575.1470 FAX

    An Equal Opportunity Employer

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME