www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date April 2nd, 2024 @ 3:00 p.m. through bid opening date

Caliba Inc. An Equal Opportunity Employer is seeking qualified DVBE subcontractors, suppliers for the following project.

Bid Date and Time:

April 18, 2024, at 2:00 PM

Project Owner:

Walnut Valley Unified School District | BID NO. 041824-2

Project:

COLLEGEWOOD ELEMENTARY SCHOOL MODULAR ADDITION, EVERGREEN ELEMENTARY SCHOOL MODULAR ADDITION, VEJAR ELEMENTARY SCHOOL MODULAR ADDITION

Wage Determination

Prevailing Wage

Location:

Walnut Los Angeles CA

Contact:

Bidding Dept.

Email Address:

bidding@calibainc.com

Phone

(714) 886-2887

Participation Goal

DVBE Participation

Plans and Specs Link:

https://drive.google.com/drive/folders/1HmG0J3jRrvHkGtkK50VXYpqcOKtX--m3?usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

The project shall include but is not limited to modification to the hardscape with new play equipment, new shade structures, a new outdoor stage, a new portable staff restroom building, new fencing, new landscaping and green spaces, and a new soccer field.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Grading, Paving, HVAC, Concrete, Plumbing, Buliding Supplies, Building Contractor, Landscaping, Trucking, Electrical, Framing. See Specs for Complete list of bid items.

Caliba Inc. requires 100% Performance & Payment Bonds. If requested, and as Caliba Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Caliba Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Caliba Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. Caliba Inc.'s listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute Caliba Inc. standard subcontract agreement if Caliba Inc. is awarded the project; the standard subcontract is available for review at Caliba Inc.’s office. At the discretion of Caliba Inc., any listed subcontractor that withdraws its bid after Caliba Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work. This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement

Caliba Inc.
8031 Main Street, Stanton, CA 90680
Phone: 714-886-2887 Fax: 714-503-6805
An Equal Opportunity Employer

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME