www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date April 2, 2026 @ 10:40 a.m. through bid opening date

Shimmick Construction Company, Inc. is a Prime Contractor requesting bids from SBE and VSBE - RAMP certified firms.  Subcontractors/Professional Services/Suppliers for the following project:

PORT OF LOS ANGELES
BERTHS 167-169 – PHASE II MARINE OIL TERMINAL IMPROVEMENTS
BID DATE & TIME: WEDNESDAY, MAY 6, 2026 @ 2:45PM
PROJECT ESTIMATE: $8M-$9M CONTRACT SBE & VSBE
Bids should be received no later than 12:00 pm on May 4, 2026, quotes received after the time listed may be considered non-responsive.

General work description:
Removal of existing wharf, installation of new steel piles and catwalk.

Scopes of work requested, but not limited to: Aggregate supply, rip rap supply, rip rap subcontractor, demolition subcontractor, fencing subcontractor, temporary fence supply, driven pile subcontractor, precast pile supply, steel pile supply, street sweeping, SWPPP/erosion control subcontractor, concrete washouts, trucking subcontractor, structural steel (bridge) subcontractor and supply, structural steel (building) subcontractor and supply, miscellaneous metal subcontractor, miscellaneous metal supply, ready mix supply, reinforcing steel subcontractor, minor structures subcontractor, painting and coatings subcontractor, welding subcontractor, diving services subcontractor, electrical subcontractor, signal and lighting subcontractor, communication and fiber subcontractor, survey subcontractor, office trailer supply, cathodic protection, dredging, and marine bio services.

Shimmick Construction will conduct itself in good faith with all firms participating in this project. Items of work may be broken down into economically feasible packages to encourage SBE/VSBE participation.

Shimmick Construction requests that Non-SBE subcontractors provide lower-tier SBE participation. Bidders are requested to indicate any lower-tier participation information so it can be evaluated as part of their quote.

For additional project information or to discuss delivery schedules, obtaining bonding, lines of credit, insurance, technical assistance, necessary equipment, supplies, and/or materials please contact the lead estimator, Kyle Nelius kyle.nelius@shimmick.com or (310) 987-1946.

Shimmick Construction Company, Inc. - 530 Technology Drive, Suite 300
Irvine, CA 92618 Phone: (949) 333-1500 Fax: (949) 333-1510

Send all quotes and/or questions regarding to this project to email kyle.nelius@shimmick.com

Contract documents are available: * The contract documents, which include instructions to bidders, plans and specifications are available through the Port of Los Angeles site PlanetBids Vendor Portal or through our Building Connected site – please reach out to ainsley.brundahl@shimmick.com and kyle.nelius@shimmick.com to request access.

If you require assistance with access to plans/specs or contract documents, please contact Ainsley Brundahl Ainsley.brundahl@shimmick.com or (949) 333-1500.

CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5.  It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

Bids submitted will confirm the acceptance of the terms and conditions of SCCI’s Standard Long Form Subcontract or Purchase Order, available upon request.  A Subcontractor/Supplier providing a proposed bid/price will be viewed as accepting SCCI’s Standard Long Form Subcontract or Purchase Order- 100% Performance and Payment bonds are required for subcontractors; material bonds are required from all suppliers. Shimmick Construction will pay bond premium up to 2%.  Subcontractors/Suppliers will be required to abide by terms and conditions of the AGC Master Labor Agreements. All proposers are bound by the prime contract terms and conditions, including payment provisions. Insurance coverage is required as set by the prime contract and/or Shimmick Construction – whichever is greatest. Minimum insurance requirements: General Liability $1M-Per Occurrence/$2M-Agg/$2M-Completed Operations; Excess Liability $5M; Auto Liability $1M; Workers Comp & Employer Liability $1M. Project specific insurance requirements are provided in detail the Special Conditions. The listing of a Subcontractor/Supplier is not to be construed as an acceptance of all the conditions or exceptions included with the price quote.  Shimmick requires that Subcontractor & Supplier price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.

Shimmick Construction Company, Inc. is An Equal Opportunity Employer

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME