www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date March 30, 2022 @ 3:00 p.m. through bid opening date


Papich Construction Company an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for referenced project:

Agency: Caltrans No. 06-0S8304
Construction on State Highway In Fresno County About 15.2 Miles Southwest Of Mendota From 1.2 Miles North Of Hudson Avenue Overcrossing To 0.4 Mile South Of Manning Avenue Overcrossing
General Work Description: Replace bridge.
District-County-Route-Post Mile:  06-Fre-5-44.4/45.4
Plans/Specs/Addendums: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=06-0S8304
                                                                                                                                    
DBE Goal: 21%

The estimated cost of the project is $12,100,000

Bids open Thursday, April 28, 2022, at 2:00 PM

***Addendums 1-3 have been issued***

Michele Marquez | Estimating Support Manager
Email: mmarquez@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Type Iii Barricade, Temporary Traffic Stripe (Tape), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System Day, Portable Changeable Message Sign (Ls), Temporary Railing (Type K), Alternative Temporary Crash Cushion, Temporary Crash Cushion Module, Temporary Radar Speed Feedback Sign System, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Storm Water Annual Report, Temporary Erosion Control Blanket, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Soil Binder, Temporary Impermeable Plastic Sheeting, Temporary Gravel-Filled Bag, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Filter Fabric, Temporary Fence (Wildlife Exclusion Gkr), Asbestos Compliance Plan, Work Area Monitoring (Bridge), Treated Wood Waste, Invasive Species Control, Bird Exclusion Devices, Clearing And Grubbing (Ls), Roadway Excavation, Shoulder Backing, (F) - Structure Excavation (Bridge), (F) - Structure Backfill (Bridge), Imported Borrow (Cy), Move-In/Move-Out (Erosion Control), Drill Seed (Acre), Hydromulch, Fiber Rolls, Straw, Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Data Core, Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Pavement (Cy), Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, 24" Cast-In-Drilled-Hole Concrete Piling, (F) - Structural Concrete, Bridge Footing, (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Approach Slab (Type N), (F) - Structural Concrete, Drainage Inlet, Furnish Precast Prestressed Concrete Wide-Flange Girder (90'-100'), Erect Precast Prestressed Concrete Girder, Joint Seal (Mr 1"), (F) - Bar Reinforcing Steel (Bridge), (F) - Headed Bar Reinforcement, Bridge Removal, 24" Temporary Culvert, 36" Temporary Culvert, 24" Corrugated Steel Pipe (.079" Thick), 24" Steel Flared End Section, 24" Temporary Steel Flared End Section, Inlet Depression, Remove Culvert (Lf), Remove Inlet, Remove Flared End Section (Ea), Temporary Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Temporary Rock Slope Protection Fabric (Class 8), (F) - Miscellaneous Iron And Steel, (F) - Temporary Steel Plate Cover, Fence (Type Bw, 5-Strand, Metal Post), Remove Fence, Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Roadside Sign (Wood Post), Furnish Laminated Panel Sign (1"-Type B), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Install Roadside Sign (Laminated Wood Box Post), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Double Midwest Guardrail System (Steel Post), Transition Railing (Type Wb-31), Rail Tensioning Assembly, Max-Tension Median Terminal System, Alternative In-Line Terminal System, (F) - Concrete Barrier (Type 836), Remove Guardrail, Salvage Metal Bridge Railing, 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), Contrast Stripe Paint (1-Coat), 6" Traffic Stripe Tape (Warranty), 6" Traffic Stripe Tape With Contrast (Warranty), 6" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12), 2" Conduit (Bridge), Mobilization

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE/DVBE/SB firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE/DVBE/SB firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published on March 30, 2022 @ 3:00 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME