Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date March 14th, 2018 @ 4:52 p.m. through bid opening date

ALL POTENTIAL DVBE SUBCONTRACTORS
********************************************************************************
     THOMPSON BUILDERS CORPORATION is requesting bids from DVBE subcontractors, suppliers & truckers for the following project:   

   Montevideo Elementary School Modernization
13000 Broadmoor Drive, San Ramon, CA  94583
Owner: San Ramon Valley Unified School District
Bid Date:   3/29/2018 @ 2:00 PM        Estimate:  $5,125,000         DVBE Goal:  3%     

SCOPE: Modernization project including but not limited to roof replacement, concrete flatwork, installation of new systems such as fire alarm, clock/PA and data, replacement of doors and hardware, replacement of windows, classroom sink upgrades, miscellaneous work.

      

Seeking DVBE subcontractors/suppliers/truckers.  TRADES NEEDED (but not limited to):
Seeking DVBE subcontractors/suppliers/truckers. Trades Needed (but not limited to):
Division 02 Existing Conditions (Selective Demolition; Asbestos & Lead Report (D); Lead- Based &
Lead Containing Materials Instructions to Contractors/Bidders (D))
Division 03 Concrete (Concrete Waterstops; Cast-In-Place Concrete (S); Membrane Forming Curing
Compound)
Division 05 Metals (Pipe Railings)
Division 06 Wood and Plastics (Rough Carpentry (S); Sheathing (S); Gypsum Sheathing; Exterior
Finish Carpentry; Interior Architectural Woodwork)
Division 07 Thermal and Moisture Protection (Below-Slab Vapor Barriers; Asphalt Shingles; Sheet
Metal Flashing and Self-Adhered Flashing; Flashing Panels; Joint Sealants)
Division 08 Openings (Hollow Metal Doors and Frames; Aluminum Windows; Door Hardware; Glazing)
Division 09 Finishes (Gypsum Board; Tiling; Acoustical Panel Ceilings; Acoustical Fiber Panels;
Acoustical Tile Ceilings; Resilient Base and Accessories; Linoleum Tile Flooring; Carpeting; Exterior
Painting and Roof Coating; Interior Painting)
Division 10 Specialties (Markerboards; Vinyl Tack board Panels; Signage; Traffic Signage ( C); Toilet
Partitions; Toilet Accessories; Fire Protection Specialties)
Division 11 Equipment (Projectors)
Division 12 Furnishings (Roller Window Shades)
Division 22 Plumbing (Plumbing Systems (M))
Division 23 Heating Ventilating and Air Conditioning (HVAC) (HVAC Systems (M)); Acceptance
Requirements)
Division 26 Electrical (Electrical General Requirements( E); Electrical Demolition ( E); Basic Electrical
Materials and Methods ( E); Occupancy Sensors ( E); Electrical Switchgear( E); Manual Transfer
Switch ( E); Lighting ( E))
Division 27 Communications (Networking and Telecommunications ( E))
Division 28 Electronic Safety (Fire Alarm System ( E))
Division 31 Earthwork (Grout( C); Demolition clearing and grubbing ( C); Earthwork ( C))
Division 32 Exterior Improvements (Asphalt Pavement Aggregate Base and Pavement Grinding ( C);
Site Concrete ( C); Pavement Stripes and Markings ( C) Decorative Metal Fences and Gates (L))
Division 33 Site Utilities (Precast Concrete Utility Boxes Inlets and Wheel Stops ( C); Potable Water
Distribution Piping ( C))

Please submit bids to us by noon on bid day.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed at various local Builder’s Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday  through  Friday  from 7:30 AM to 4:30 PM.  Or may be emailed upon request.

Thompson Builders Corporation is an Equal Opportunity Employer


Contact:  Dalia Nieto  (415) 456-8972        FAX: (415) 459-0665

EMAIL:  dalian@tbcorp.com

 

 

Published on March 14th, 2018 @ 4:52 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME