Contractors Estimate.com
Saving contractors time and money by delivering complete bid estimates.

 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

Advertisement date March 7th, 2018 @ 3:55 p.m. through bid opening date

ALL POTENTIAL DVBE SUBCONTRACTORS
********************************************************************************
     THOMPSON BUILDERS CORPORATION is requesting bids from DVBE subcontractors, suppliers &  truckers for the following project. 

Castro Valley High School
Health & Wellness Center, Project Lead the Way, and
400 Building Modernization Project
Owner: Castro Valley
Bid Date:   3/21/2018 @ 3:00 PM        Estimate: $7,500,000 -$8,000,000              

Seeking DVBE subcontractors/suppliers/truckers.  TRADES NEEDED (but not limited to):
- Division 03 Concrete (Formwork; Concrete Reinforcement;
Cast-In-Place Concrete; Self Leveling Underlayment)
- Division 05 Metals (Structural Steel; Steel Decking; Cold
Formed Metal Framing; Metal Fabrication)
- Division 06 Wood, Plastics, and Composites (Rough Carpentry; Miscellaneous Carpentry; Finish
Carpentry; Architectural Woodwork)
- Division 07 Thermal and Moisture Protection (Thermal Insulation; Board Insulation; Roof Deck and
Insulation; Water Vapor Emission Control; TPO Memebrane Roofing; Flashings & Sheet Metalwork;
Roof Hatch; Joint Sealer)
- Division 08 Openings (Steel Doors & Frames; Interior Aluminum Frames; Flush Wood Doors;
Access Doors & Panels; Aluminum Windows; Glass & Glazing)
- Division 09 Finishes (Lath and Portland Cement Plaster; Gypsum Sheating Board; Acoustic Ceiling
Tiles; Resilient Tile Flooring; Resilient Wall Base; Resilient Sheet Flooring; Epoxy Flooring;
Acoustical Insulation & Sealants; Painting; Concrete Floor Sealing)
- Division 10 Specialties (Visual Display Boards; Identifying Devices; Fire Protection Specialties)
- Division 12 Furnishings (Window Rolling Blackout Shades)
- Division 14 Conveying Systems (Hydraulic Elevators)
- Division 21 Fire Suppression (Wet-Pipe Sprinkler System)
- Division 22 Plumbing (Plumbing)
- Division 23 Hating Ventilating and Air Conditioning (Heating, Ventilation, Air Conditioning (HVAC);
Common Work Results for HVAC; Noise & Vibration; Identification for HVAC; Testing Adjusting &
Balancing HVAC; Duct Insulation; HVAC Piping Insulation; Refrigerant Piping; Metal Ducts; Air Duct
Accessories; Package Rooftop Air Conditioning Units; Variable Refrigerant System; VRF Fan Coils)
- Division 26 Electrical (Basic Electrical Requirements; Conductors and Cables; Grounding and
Bonding; Seismic Controls for Electrical Work; Raceways and Boxes; Distribution Board Panelboard;
Wiring Devices; Enclosed Switches and Circuit Breakers)
- Division 27 Communications (General Technology Requirements)
- Division 28 Electronic Safety and Security (Fire Alarm System)

Please submit bids by noon on bid day. 

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed at various local Builder’s Exchanges, in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato, Monday  through  Friday  from 7:30 AM to 4:30 PM.  Or may be emailed upon request.  Or may be downloaded from the link:
https://tpcorp.box.com/s/yxgvwy6xjj9gv2iwipw4io2a02ox6fn0

Thompson Builders Corporation is an Equal Opportunity Employer
Contact:  Dalia Nieto  (415) 456-8972        FAX: (415) 459-0665
EMAIL:  dalian@tbcorp.com

 

 

Published on March 7th, 2018 @ 3:55 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME