www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date March 5th, 2024 @ 1:45 p.m. through bid opening date

Griffith Company an Equal Opportunity Employer, is requesting sub-bids from all qualified subcontractors and suppliers, including certified DBE firms performing a commercially useful function, for the following project.
 
Contracting Agency: City of El Paso de Robles | Project No.: DPW NO. 20-21
Project: CDBG 17th Street Pedestrian and Road Repair Improvements
Location: Paso Robles San Luis Obispo CA 93446
Bid Date: March 21, 2024, at 2:00 PM
DBE Goal: 6%

Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/i7hsht1i65gcjxqvkf1q5/h?rlkey=of9jmcd6fr23yewmzrjq4pjva&dl=0

General work description: The work generally includes, but is not limited to, removal and replacement of PCC curb ramps, curb, gutter, spandrel, sidewalk and cross gutters, paving and restriping, and full depth reclamation for paving repairs, on 17th Street from Chestnut to Spring Street, all as shown on the plans and/or as specified herein.
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization, Noise/Dust/Storm Water Pollution Control, Traffic Control, comply with OSHA, Pre-Construction Video/Photo Documentation, Sawcut, Remove, Grade, and Replace AC, Sawcut, Remove, Grade, and Replace Sidewalk, Sawcut and Remove concrete (ramp or sw), Grade, and construct ramp. Sawcut, Remove, and Replace Curb & Gutter, Construct Sidewalk, Construct Retaining Curb, Construct Curb & Gutter, "Sawcut, Remove, and Replace Driveway, Approach", Sawcut, Remove Concrete, and Replace Alley Approach, Sawcut and Construct Driveway Approach, "Sawcut, Remove AC, and Construct Alley, Approach", "Provide Detectable Warning (Safety step TD or approved equal)" Remove Existing Decorative Rock, Provide Mulch, Reconstruct Existing Brick Paver Pathway, Relocate Existing Sign, relocate mailbox, adjust water/gas valve cover and box to grade, adjust utility box to grade, Tree Root removal/Trimming/Pruning, Sawcut, Remove Concrete & Replace Existing Cross Gutter/Spandrel, replace existing drop inlet with drainage inlet, Construct Curb & Gutter (see sheet 9) Contractor to engage the services of licensed arborist to address the tree root conflicts. Contractor to engage the services of licensed land surveyor to provide construction staking. Mobilization, Bonds & Insurance, Notification of Residents, Businesses & Agencies, Traffic Control Storm Water Pollution Control Program, Construction ADA Accessibility Plan, Preserving Survey Monumentation (Allowance), 1/2" HMA Type A (PG 64-10), Cold Plane & Remove 0.58' Existing Section 0.50' Deep Lift Stabilization (Allowance), Pulverize 0.83' of Existing Section, Remove, Trim & Dispose 0.29' Pulverized Material, Regrade, Quicklime/Cement Treat 0.54' Subgrade, Trim to Top of Subgrade Cement (Allowance), Quicklime (Allowance), Install Shoulder Backing, Lower Manhole Cover Lower Water Valve Cover, Lower Survey Monument, Adjust Manhole Cover to Finish Grade Adjust Water Valve Cover to Finish Grade, Adjust Survey Monument to Finish Grade, Remove and Dispose Water Valve, Install Blue RPM @ Fire Hydrant, Install White "STOP" Legend (Thermoplastic) Install White "AHEAD" Legend (Thermoplastic), Install Yellow "SLOW" Legend (Thermoplastic) Install Yellow "XING" Legend (Thermoplastic), Install Yellow "AHEAD" Legend (Thermoplastic) White Ladder Crosswalk (Thermoplastic), Yellow Ladder Crosswalk (Thermoplastic) 12" White Crosswalk / Limit Line (Thermoplastic), Striping Detail #1 (Thermoplastic) Remove & Reinstall Signpost & Sign, Install Signpost & Sign

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Griffith Company
CA Contractors License #88
1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME