www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date February 27th, 2023 @ 1:23 p.m. through bid opening date

Comet Electric, Inc an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for referenced project:

Agency: The City of Inglewood | Invitation #RFB-0157
Project: Highway Safety Improvement Cycle 9 Program: HSIPL-5164 (035) Pedestrian Safety Improvements Project
Bid Date:  March 29, 2023, at 12:00 PM (PST)
DBE Goal: 12%

Scope of Services: Cycle 9 Highway Safety Improvement Program (HSIP) Project which entails the installation of high visibility crosswalk enhancement including pedestrian signals, signing and striping, and rectangular rapid flashing beacon at the below locations.
–Centinela Avenue at Market Street
–Manchester Boulevard at Cedar Avenue;
–On Regent Street between Grevillea Avenue and La Brea Avenue;
–On Market Street between Regent Street and Queen Street and;
–On Market Street between Queen Street and Manchester Boulevard.

Plans & Specs can be downloaded for free at: https://www.dropbox.com/scl/fo/33bc0dcibtmzs56gyrqgm/h?dl=0&rlkey=wq3mvhtu1xqhe6tn7etqvhfel

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:Traffic Control, Furnish & Install 2” PVC Signal Conduit, Furnish & Install 3” PVC Signal Conduit, Furnish & Install 3” PVC Fiber Optic Conduit, Furnish & Install 3” PVC RRFB Conduit, Furnish & Install SCE 3” Schedule 80 PVC Conduit & Pull Rope, Furnish & Install #5 Pull Box, Furnish & Install #6 Pull Box, Furnish & Install #6E Pull Box, Furnish & Install B40E Pull Box, Furnish & Install SCE H&-Holes, Furnish & Install Type 2070 ATC Controller & Type 352I ATC Cabinet, Including All Equipment & Communications, Complete Per Plan, Furnish & Install Type III-Bf Service Enclosure, Including Equipment, Complete Per Plan, Furnish & Install Battery Backup System Complete Conductors, Cables & Wiring Per Location, Complete Per Plan, Furnish & Install Type 15Ts Standard, 15’ LMA, Including Anchor Bolts & CIDH Foundation Furnish & Install Type 19-4-100 Standard, 25’ Ma, 15’ LMA, Including Anchor Bolts & CIDH Foundation, Furnish & Install Type 19-4-100 Standard, 30’ Ma, 15’ LMA, Including Anchor Bolts & CIDH Foundation, Furnish & Install Type 24-4-100 Standard, 35’ Ma, 15’ LMA, Including Anchor Bolts & CIDH Foundation, Furnish & Install Type 1-B Standard, Including Anchor Bolts & Foundation, Furnish & Install Type C-1-100 Standard (LADOT), 15' LMA, Including Anchor Bolts & LADOT Foundation, Furnish & Install 3-Section Led Hawk Signal Head, Including Mounting, Furnish & Install Led Pedestrian Head, Including Mounting, Furnish & Install Type B Pedestrian Push Button Assembly Complete, Including Sign, Furnish & Install Led Luminaire, Furnish & Install Street Name Sign On Signal Mast Arm, Furnish & Install RRFB System Complete, Furnish & Install Loop Detector, Furnish & Install CCTV Camera System Complete, Including Mounting Bracket & Wiring., Furnish & Install 12 Str& SMFO Cable & #10 Green Trace Wire., Furnish & Install New Hardened Ethernet Switch (Complete), Four (4) EtherWAN SFP Model Ex 1250Tsp- Mb5L-As & Two (2) Sfptis10M Or City Approved Equal., Furnish & Install New Fiber Patch Panel (FPP). Complete Connections To Drop Cable, Pigtails, & FPP., Furnish & Install Splice Enclosure. Fusion Splice SMFO Cables. , Communication System & Fiber Optic Testing, Install Signing & Striping At Centinela Ave & Market St Complete Per Plan., Install Signing & Striping At Manchester Blvd & Cedar Ave Complete Per Plan., Install Signing & Striping On Regent Ave From Grevillea Ave To La Brea Ave Complete Per Plan., Install Signing & Striping On Market Street From Regent St To Manchester Blvd Complete Per Plan., Remove Existing Pull Box Complete., Remove Existing Street Light Pole Complete, Including Foundation, Remove Existing Flashing Beacon Complete, Including Foundation, Reconstruct Curb Ramp, Maintaining Existing & Temporary Electrical Systems.

Comet Electric, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. 100% Performance and Payment bonds required. Subcontractor’s must possess a current contractor’s license.

Requirements: No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work, unless currently registered to perform public work with the Dept of Industrial Relations https://efiling.dir.ca.gov/PWCR/Search.action

Please call if you need any bidding assistance including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors#
California Access to Capital Program Financing Solutions for your small business http://www.calbizfinance.org/cal_cert_biz_program.html

Comet Electric, Inc
License# 681827
21625 Prairie St, Chatsworth, CA 91311
Contact: Louis Perez
818-340-0965 Office
818-340-4033 Fax
louisperez@cometelectric.com

Published on February 27th, 2023 @ 1:23p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME