Saving contractors time and money by delivering complete bid estimates.

Online DVBE certification is here!

Advertisement date February 15th, 2018 @ 2:52 p.m. through bid opening date

USS Cal Builders is seeking qualified DBE subcontractors, suppliers and firms to meet or exceed the 8% goal for the SOTO STREET BRIDGE OVER VALLEY BOULEVARD & UNION PACIFIC RAILROAD Projec

Bid Date and Time:

MARCH 7, 2018 at 10:00 AM

Project Owner:


Engineer’s Estimate:

$11.95 MILLION

Estimator’s Name:


Email Address:

Estimator's Phone:

(714) 828-4882 Ext. 3

Estimator’s Fax:

(714) 503-6805

Project No. BHLS-5006-(193)

Plans and Specs Link: OR



Project Scope: Rehabilitation of the Soto Bridge, the bridge deck will be repaired and widened by approximately 25 feet to a total width of 79 feet and approach roadway. The existing curb barriers and sidewalks will be replaced with architectural barriers, wider sidewalks, and shoulders on both sides of the bridge. The roadway beyond bridge approach will be widened to provide standard street width.

The Work includes, but is not limited to:Shoring, Structural Excavation, Structural Backfill, CIDH Piles, Precast Concrete Girders, Joint Seal, Polyester Concrete, Anti-Graffiti, Miscellaneous Metals, Asphalt, Chain Link Railing, Steel Soldier Pile, Tubular Hand Railing, Coring, Metal Beam Guard Rail, Chain Link Fence, Concrete Curb, Reinforced Concrete Pipe, Traffic Control, Electrical, Traffic Striping

USS Cal Builders requires 100% Performance & Payment Bonds. If requested, and as USS Cal Builders way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website ( ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.


USS Cal Builders Inc.

An Equal Opportunity Employer.

Bidding Department

8051 Main Street, Stanton, CA 90680

License # 654454


Published on February 15th, 2018 @ 2:52 p.m. by Contractor’s Estimate, Inc.
Located at

This advertisement will run through the bid date

What are we about? Contact us HOME