www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date February 17th 2023 @ 1:32 p.m. through bid opening date

GRIFFITH COMPANY
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified SBE Subcontractors & Suppliers
For the following project:

Agency: Port of San Diego - Spec. No. 2021-12
Project: Sweetwater Park
Bid Date: March 22, 2023, at 2:00 PM
SBE Goal: 20%
Estimated Bid Value $13,500,000.00
Plans & Specs can be downloaded for free at: https://www.dropbox.com/scl/fo/qu7y2mg4knzblxkaxyu4g/h?dl=0&rlkey=86n3hu7ctlrppey1wze5885tv

** Addendum 1 issued 3/14/2023**

Scope of Services: This project includes construction of a new park improvement on the S-2 parcel and portions of the SP-1 and HP-1 (N) parcels at the Chula Vista Bayfront development site. The project includes construction of a 156-car AC paved parking lot along with two decomposed granite parking areas with an additional 63 spaces. In addition to the parking lots, site improvements include grading and earthwork, drainage improvements, site water, sewer, and electrical utilities and service connections to public utilities, an environmental fence, a dumpster enclosure, a growing grounds/maintenance shelter, Growing Grounds building, Restroom/Comfort Station building with sewer lift station, site electrical and lighting improvements, concrete and decomposed granite paved walkways and paths. Site furnishings and amenity improvements include play equipment and surfacing, benches, receptacles, concrete seatwalls, bollards, bike racks and park signage. Landscape improvements include groundcover, shrub, and tree plantings to re-vegetate the majority of the park site. Compensatory mitigation planting to mitigate disturbance to sensitive biological resources within the park development footprint, and irrigation improvements in all planted landscape areas.

Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified SBE firms performing commercially useful function for the following items of work, including but not limited to: Mobilization and Demobilization, Insurance and Bonds, Allowance for Utility and Permit Fees, Site Demolition, Site Preparation/Grading/Earthwork/Fine Grading, Export to Class 2 Landfill, Site Drainage, Site Water and Sewer Underground Utilities including Installation of Base Bid Item 10 Sewer Pump Station, Early Procurement Item: Sewer Pump Station Components, Site Electrical Utilities and Lighting for a complete electrical system including installation of Base Bid Item 12 Electrical Distribution Gear and Meter Pedestal, Early Procurement Item: Electrical Distribution Gear and Meter Pedestal, Comfort Station Building in its entirety including Installation of Base Bid Item 14 Comfort Station Structural Steel Members, Early Procurement Item: Comfort Station Structural Steel Members, Trash Enclosure, Parking Lot Improvements, Site Hardscape (Concrete paving, Decomposed Granite paving, paths), Environmental Fence and Mitigation Fence, Site Furnishings (Seatwalls, Receptacles, Bike Racks, Bollards), Signage (Monument Signs, Regulatory, Wayfinding, Interpretive), Nature Play Area Equipment, Surfacing, and Fencing including installation of Base Bid Item 22 Nature Play 2-5 Structure, 5-15 Structure, Standard Swings, Early Procurement Item: Nature Play 2-5 Structure, 5-15 Structure, Standard Swings, Landscape Plant Systems Including   Select Materials not in Bid Item 24 and installation of Plant Materials in Base Bid Item 24, Early Procurement Item: Landscape Material Pre-installation Plant Establishment, Planting Area Soil Conditioning, Mulch – Rock, Cobble, Gravel, Mulch – Organic, Boulders, Bioswales Soil, Landscape Irrigation System including installation of Base Bid Item 31 Irrigation PVC Pipe, PVC Fittings, and Irrigation Heads, Early Procurement Item: Irrigation PVC Pipe, PVC Fittings, and Irrigation Heads, 6 Month Landscape Maintenance, Lagoon Drive Water Utility Removals and Reconfiguration, Lagoon Drive Electrical Utility Removals and Reconfiguration, Allowance for Related Work, Site Demolition, Site Preparation/Earthwork/Fine Grading, Growing Grounds Structure in its entirety including Installation of Additive Bid Schedule Item 4 Growing Grounds Structure Structural Steel Members, Early Procurement Item: Growing Grounds Structure Structural Steel Members, Site Hardscape (Concrete paving, Decomposed Granite Paving, Paths), Fencing and Gates, Irrigation (Hose Bibb Installation), Site Demolition, Site Preparation/Earthwork/Fine Grading, Import Yellow Fill, Site Drainage, Site Hardscape (Concrete Paving, Decomposed Granite Paving, Paths), Site Furnishings (Benches, Seat walls, Bird Blind, Mitigation Fencing, etc.), Adventure Area Play Equipment. Surfacing, and Fencing, Signage (Regulatory, Wayfinding, Interpretive), Dune Areas Sand Improvements, Bioswale Soils, Boulders, Landscape Plant Systems Including Select Materials not in Additive Bid Schedule Item 13 and installation of all Plant Materials Including those in Additive Bid Schedule Item 13 Landscape Material Pre-installation Plant Establishment, Early Procurement Item: Landscape Material Pre-installation Plant Establishment, Planting Area Soil Conditioning, Landscape Irrigation System including installation of Materials in Additive Bid Schedule 2 Item 16 Irrigation PVC Pipe, PVC Fittings, and Irrigation Heads, Early Procurement Item: Irrigation PVC Pipe, PVC Fittings, and Irrigation Heads, 6 Month Landscape Maintenance, Site Demolition, Site Preparation/Earthwork/Fine Grading, Site Drainage, Pre-Engineered Shade Shelters Including Installation of Additive Bid Schedule 3 Item 5 Pre-Engineered Shade Shelters, Early Procurement Item: Pre-Engineered Shade Shelters, Site Hardscape (Concrete paving, Decomposed Granite Paving, Paths), Site Furnishings (Tables, Receptacles, Seat Boulders), Nature Play Area Equipment and Surfacing, Boulders, Landscape Plant Systems Including all Installation and Select Materials not in Bid Item 11 and installation of Landscape Materials Included in Additive Bid Schedule 3 Item 11, Early Procurement Item: Landscape Material Pre-installation Plant Establishment, Planting Area Soil Conditioning, Mulch – organic, Landscape Irrigation System including installation of Irrigation PVC Pipe, PVC Fittings, and Irrigation Heads Included in Additive Bid Schedule 3 Item 15, Early Procurement Item: Irrigation PVC Pipe, PVC Fittings, and Irrigation Heads, 6 Month Landscape Maintenance, Trucking, Equipment Rental.

Plans & Specs available for review from 7:00 AM – 5:00 PM
Monday through Friday at:
Griffith Company
(an Equal Opportunity Employer)

13400 Sabre Springs Parkway, Suite 200 San Diego, Ca. 92128
Phone 619-587-0829 Fax 714/854-0228
Contact: Jerred Dejong , ESTIMATOR
jdejong@griffithcompany.net

100% Bonding may be required for all subcontractors
Assistance available in obtaining Bonds, Lines of Credit,
Insurance, Necessary Equipment, supplies, materials & Technical Assistance.
GRIFFITH COMPANY INTENDS TO CONDUCT ITSELF IN “GOOD FAITH” WITH
SBE FIRMS REGARDING PARTICIPATION ON THIS PROJECT.

Published on February 17th 2023 @ 1:32 p.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME