Advertisement date: February 1st, 2018 @ 11:21 a.m. through bid opening date

 

Is requesting sub-bids from qualified DBE Subcontractors and Suppliers for the following project:

COCONINO COUNTY LINE – I-40 (NB) CORDES JCT – FLAGSTAFF HWY (I-17)

ADOT TRACS NO. – 017 CN 311 H893401C
 PROJECT NO. – NHPP-017-B(232)T ~  COCONINO COUNTY, AZ

**THIS PROJECT HAS A 7.89 % DBE GOAL**

Bid Date: FEBRUARY 9, 2018 @ 11:00AM

NEW BID DATE: Friday, February 16th, 2018 @ 11:00 am (M.S.T.)

NEW BID DATE: Friday, February 23rd, 2018 @ 11:00 am (M.S.T.)

Please respond by 5:00 p.m., FEBRUARY 22, 2018

 

FOR PLAN AND SPECS ON TRAC NO H893401C PLEASE VISIT:

http://www.azdot.gov/business/ContractsandSpecifications/CurrentAdvertisements

We are seeking quotes from all small business concerns - CERTIFIED DBE including, but not limited to, the following work items:  Removals, Geotextile fabric, AB, AC Paving and/or paving material supply, RCP supply, signs, temporary impact attenuator device, TCB, temporary pavement marking tape, pavement marking obliteration, traffic control services, flagging (civilian), flagging (DPS), electrical, seeding, erosion control, fencing, guard rail, riprap material, curb and gutter installation, on-site biologist, control of noxious weeds, construction surveying, ground-in rumble strip, bridge deck grooving, saw and seal, reinforcing steel supply and install, concrete supply, thrie-beam guard rail system install, dowels, deck joint assembly, slope paving, drilled shaft foundations.

The amount programmed for this contract is $31,500,000.  The proposed project is located in Coconino County on Interstate 17 between Milepost 311.60 and Milepost 339.90 (NB only). The work consist of pavement and bridge rehabilitation replacement. The work includes milling and repaving of asphalt concrete pavement, removing and replacing the northbound and outbound bridge decks and approach slabs, northbound bridge deck widening at Willard Springs Road TI, slope paving repair, guardrail replacement, repairing northbound approach slab for Woods Canyon Bridge NB at MP 317.03, New dadoes and three beam transitions installation, pavement marking, signing and other related work.

Quotations must be valid for the same duration as specified by the Owner for contract award. Insurance and 100% Payment & Performance Bonds will be required, and will pay up to 1.5% for the cost of the bond.  Waiver of Subrogation will be required.  We will provide assistance/advice with obtaining Bonds/Insurance/Credit/Equipment. Subcontractors must provide contractor’s license number with their quote.  Plans and specs are available at no cost to interested DBE firms from the ADOT website using the Project No. NHPP-017-B(232)T.  You must have a valid AZ UTRACS registration.  This project is Certified Payroll.  We are an EOE & seriously intend to negotiate with qualified firms.

 If you have any questions, Please contact Marty Keane: Phone 858-536-3100, Fax 858-586-0164 or email estimating@coffmanspecialties.com

 

Coffman Specialties, Inc.
9685 Via Excelencia, Suite 200 San Diego, California 92126 
Phone (858) 536-3100 Bid Fax (858) 586-0164

Published on February 1st, 2018 @ 11:21 a.m. by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run until the bid date

 
NEWS
&
EVENTS
 
What are we about? Contact us HOME